CECS 154-2003 in English
VALIDTechnical specification for application of fire stopping in buildings
- Issued on:2003-09-25
- Implemented on:2003-12-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
Price(USD):
$500.00
$485.00
$485.00
Scope
This procedure is applicable to the design and construction of fireproof and smokeproof sealing of through-holes, building gaps, etc. in newly built, renovated or expanded buildings.
Sample only — not a preview of CECS 154-2003

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

CECS 189-2005 in English
Technical specification for nitrogen injection/oxygen control fire prevention system
2005-09-10 -

CECS 234-2008 in English
Technical specification for CPVC pipeline engineering on sprinkler systems
2008-02-27