Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
secondary fusion pole switch introduction interpretation technical dimensions circuit breaker requirements load switch requirements load test low temperature test impulse immunity test resistant water standard literature internal combustion engine oil oxidation corrosion simulation method
DL/T 2859-2024 in English

DL/T 2859-2024 in English

VALID

12kV primary and secondary fusion pole switch

  • Issued on:2024-12-25
  • Implemented on:2025-06-25
  • File Format:PDF
  • Delivery:Via email within 2~4 business days
Price(USD): $449.00
$436.00
Standard No: DL/T 2859-2024
Document status: VALID
Title in English: 12kV primary and secondary fusion pole switch
Title in Chinese: 12kV一二次融合柱上开关
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 2~4 business days
Issued on: 2024-12-25
Implemented on: 2025-06-25
ICS Classification: 29.130.10-High voltage switchgear and controlgear
Chinese Classification: K43-High voltage switchgear
Professional Classification: DL-Electricity
Related Keywords: secondary fusion pole switch introduction interpretation
technical dimensions circuit breaker requirements load switch requirements
load test
low temperature test
impulse immunity test


Introduction

Interpretation of the core content of the standard

DL/T 2859-2024 is my country's first industry standard for 12kV primary and secondary integrated pole-mounted switches, which specifies the performance requirements of equipment in harsh environments from -40℃ to +40℃. The standard innovatively integrates components such as circuit breakers/load switches, feeder terminals, and transformers to achieve key technical indicators such as fault location accuracy ≤10 meters and permanent magnet mechanism action time ≤70ms.


Key technical requirements

Technical dimensions Circuit breaker requirements Load switch requirements
Mechanical life ≥10000 times (vacuum) ≥5000 times (SF6)
Protection level Common box type IP67/pillar type IP55
Fault handling time ≤70ms(permanent magnet) N/A

Technological Evolution of Transformers

The standard innovatively proposes three parallel solutions for transformer technologies:

  1. Electromagnetic transformer: secondary current 1A/5A, accuracy 0.5S level
  2. Analog electronic: output voltage 1V/0.2V, temperature range -40~70℃
  3. Digital electronic: supports GB/T 20840.9 digital interface

Typical cases show that the zero-sequence measurement error of electronic transformer can still be controlled within 10% at 120% rated current.


Complete test system

The standard establishes 10 major test items, among which the key innovations include:

  • Lightning impulse immunity test: 100% remote control success rate is guaranteed after 5 impulses of positive and negative polarity
  • High and low temperature test: Maintain level 1 measurement accuracy under -40℃/6h conditions
  • Power supply load test: Supercapacitors need to support 15 minutes of terminal operation

Implementation suggestions

Three suggestions are put forward for the implementation of the standard:

  1. Give priority to the fully sealed common box type structure, and the diameter of the grounding bolt ≥12mm
  2. The reclosing parameters are recommended to be set to a three-time sequence of 0.5s+60s+60s
  3. The aviation plug should have the function of self-shorting the CT terminal to prevent the risk of open circuit

Sample only — not a preview of DL/T 2859-2024
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend