DL/T 5083-2004 in English
ABOLISHEDSpecification of prestressing tendon construction for hyudropower and water conservancy project
- Issued on:2004-03-09
- Implemented on:2004-06-01
- File Format:PDF
- Delivery:Via email within 10 business days
$1,455.00
本标准规定了预应力锚索材料检验、基本性能试验、施工和施工期监测的基本要求。
本标准适用于水电水利工程中的岩体如固及混凝土结构后张预应力锚索施工,其他工程的岩体加固及混凝土结构后张预应力锚索施工可参照执行。
Introduction
*** Please note: This description may not be accurate, please refer to the official documentation.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

DL/T 5198-2013 in English
Code for the Construction of Crane Girders Anchored To Rock Face for Hydropower and Water Resources Projects
2013-03-07 -

DL/T 5113.14-2018 in English
Quality grade evaluation standard of unit engineering for hydropower and water conservancy construction engineering Part 14:Concrete face rockfill dam project
2018-04-03 -

DL/T 5761-2018 in English
Techinical specification for constrcution of hyfraulic concrete interface bonding agent
2018-04-03 -

DL/T 5237-2010 in English
Technical guide for grouting recorder
2010-05-01 -

DL/T 5424-2009 in English
Code for anchor bolt no-damage detecting of hydropower and water resources engineering
2009-07-22 -

DL/T 5389-2007 in English
Construction technical specifications on rock-foundation excavating engineering of hydraulic structures
2007-07-20 -

DL/T 5401-2007 in English
Instrument allocation guide for electrical test of hydropower plant
2007-12-03 -

DL/T 5215-2005 in English
Specification for waterstop of hydraulic structure
2005-02-14