VALIDQuality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering. Part 3:Turbine and generator units installation engineering
- Issued on:2012-01-04
- Implemented on:2012-03-01
- File Format:PDF
- Delivery:Via email within 5 business days
$1,223.00
Scope
This standard specifies the evaluation method for the installation quality grade of hydraulic turbine generator units and ancillary equipment units in hydropower and water conservancy capital construction projects. This standard is applicable to the engineering quality grade assessment of hydroelectric generator units that meet one of the following conditions: 1. Single unit capacity is 15MW and above. 2 Impact turbine, the nominal diameter of the runner is 1.5m and above. 3 Francis turbine, the nominal diameter of the runner is 2.0m and above. 4 Axial flow and oblique flow turbines, the nominal diameter of the runner is 3.0m and above. This standard also applies to the quality grade assessment of reversible pumped storage unit installation projects. This standard does not apply to the unit project quality grade assessment of bulb tubular turbine generator set installation projects. For relevant content, please refer to DL/T 5113.11 "Unit Project Quality Grade Assessment Standard for Hydropower and Water Conservancy Capital Construction Projects - Part 11: Bulb Tubular Type Hydro-turbine generator set installation project".

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

DL/T 790.12-2001 in English
Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications
2001-12-26 -

DL/T 646-1998 in English
Technical specification of manufacturing steel transmission pole structures
1998-03-19