DL/T 5199-2004 in English
SUPERSEDEDSpecification of concrete cut-off wall used for hydropower and water conservancy project
- Issued on:2004-10-20
- Implemented on:2005-04-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$388.00
本标准规定了水电水利工程混凝土防渗墙施工的技术要求和工程质量检验、评定方法。
本标准适用于水电水利工程松散透水地基或土石坝(堰)体内深度小于70m,墙厚300mm~1000mm 的混凝土防渗墙工程。深度和厚度超出上述范围的混凝土防渗墙和其他建筑物其他用途的地下连续墙工程可参考使用。

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

DL/T 5761-2018 in English
Techinical specification for constrcution of hyfraulic concrete interface bonding agent
2018-04-03 -

DL/T 5389-2007 in English
Construction technical specifications on rock-foundation excavating engineering of hydraulic structures
2007-07-20 -

DL/T 5251-2010 in English
Technical code for detection and evaluation of hydraulic concrete structure
2010-05-01 -

DL/T 5215-2005 in English
Specification for waterstop of hydraulic structure
2005-02-14 -

DL/T 5241-2010 in English
Technical specifications for durability of hydraulic concrete
2010-05-01 -

DL/T 5113.14-2018 in English
Quality grade evaluation standard of unit engineering for hydropower and water conservancy construction engineering Part 14:Concrete face rockfill dam project
2018-04-03 -

DL/T 5198-2013 in English
Code for the Construction of Crane Girders Anchored To Rock Face for Hydropower and Water Resources Projects
2013-03-07