DL/T 5212-2005 in English
SUPERSEDEDCode on compiling tender design report of hydropower projects
- Issued on:2005-02-14
- Implemented on:2005-06-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$2,067.00
本标准规定了水电工程招标设计报告编制的原则、工作内容和深度,以及报告的编写要求。 本标准适用于新建、扩建的大、中型水电站和抽水蓄能电站工程招标设计报告的编制。
Scope
This standard specifies the principles, work content and depth of the preparation of hydropower project bidding design reports, as well as the report preparation requirements. This standard is applicable to the preparation of bidding and design reports for newly built and expanded large and medium-sized conventional hydropower stations and pumped storage power stations. Medium-sized hydropower projects can be simplified appropriately as needed, and reconstruction and reinforcement projects of existing hydropower stations and small hydropower projects can be used as a reference.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

DL/T 5389-2007 in English
Construction technical specifications on rock-foundation excavating engineering of hydraulic structures
2007-07-20 -

DL/T 5113.14-2018 in English
Quality grade evaluation standard of unit engineering for hydropower and water conservancy construction engineering Part 14:Concrete face rockfill dam project
2018-04-03 -

DL/T 5198-2013 in English
Code for the Construction of Crane Girders Anchored To Rock Face for Hydropower and Water Resources Projects
2013-03-07 -

DL/T 5761-2018 in English
Techinical specification for constrcution of hyfraulic concrete interface bonding agent
2018-04-03 -

DL/T 5215-2005 in English
Specification for waterstop of hydraulic structure
2005-02-14 -

DL/T 5401-2007 in English
Instrument allocation guide for electrical test of hydropower plant
2007-12-03