Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
control protection requirements control equipments control technology fossil fuel power plant various control equipments host computer security introductionthis document knife test verification type test
DL/T 591-2010 in English

DL/T 591-2010 in English

SUPERSEDED

Specification of instrumentation and control for turbine-generator in fossil fuel power plant

  • Issued on:2010-05-24
  • Implemented on:2010-10-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $180.00
$175.00
Standard No: DL/T 591-2010
Document status: SUPERSEDED
Superseded by: DL/T 591-2022 Specification of instrumentation and control system for turbine-generator in fossil fuel power plant
Superseded on: 2022-11-13
Title in English: Specification of instrumentation and control for turbine-generator in fossil fuel power plant
Title in Chinese: 火力发电厂汽轮发电机的检测与控制技术条件
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2010-05-24
Implemented on: 2010-10-01
Superseding: DL/T 591-1996 Directives of thermal instrumentation and control for turbo-generator in power plant
ICS Classification: 25.040.40-Industrial process measurement and control
Chinese Classification: N17-Automatic control and remote control equipment
Professional Classification: DL-Electricity
Related Keywords: control protection requirements
control equipments
control technology
fossil fuel power plant
various control equipments
Related Topics: dynamo
generator standard
generator standard
thermal power plant steam turbine numbers
Motor detection
Motor detection
Generator detection
thermal power plant
thermal power generation
Generator detection basis
R & D conditions
Generator detection basis
hj 591-2010
Motor detection
R & D conditions
Determination of Copper in Thermal Power Plants by UV
Motor and wire control
detection technology
turbo generator
Thermal power generation steam turbine design
Thermal power generation standards
Thermal power plant debugging technology


1 Scope

This standard specifies the basic requirements for inspection and control technology of hydrogen, oil and water system supplied with the main body in main body specifications of turbine generators, basic requirements for the inspection and control equipments provided by in complete set as well as the test and acceptance requirements.
This standard is applicable to the unit cooled by water hydrogen cooling method (the generator stator winding is cooled by water and the rotor and iron core is cooled by hydrogen) with capacity at or more than 300MW; other units may also take a reference to this standard.

2 Normative Reference

The following documents contain provisions which, through reference in this text, constitute provisions of this standard. For dated reference, subsequent amendments to (excluding corrigenda), or revisions of, any of these publications do not apply. However, all parties coming to an agreement according to this standard are encouraged to study whether the latest edition of these documents is applicable. For undated references, the latest edition of the normative document is applicable to this standard.
DL/T 5182 Technical rule for designing of local equipment installation pipeline and cables of I&C in power plant
IEC 61158 Industrial communication networks-Field bus specifications

3 Technical Requirements

3.1 General requirements
3.1.1 The adopted inspection, control, protection instrument and the inspection and control equipments shall have the experience of successful application at similar condition; the technology shall be advanced and can ensure safe and economical operation and meet the national relevant standard. The disused products or the products will fall into disuse shall not be adopted. The various control equipments of instruments shall meet the relevant requirements of explosion-proof, fire prevention, water-proofing, corrosion protection and dustproof and shall meet conform to the provisions of DL/T 5182 according to different installation sites.
3.1.2 The provided inspection, controlling and protection equipments shall meet the automatic monitoring technology developing requirements of current power station. The quantity and function of monitoring facilities shall meet the automatic starting requirements of turbine generators. If the relevant operation parameters of unit endanger the safe operation of generator, the warning signal and reliable stopping signal shall be sent out.
3.1.3 The intelligent instrument of field bus or equipments provided in complete set according to customer requirements shall conform to IEC 61158 and relevant international standard; the relevant diagnose, management software of field bus protocol should be adopted to realize the remote maintenance for the calibration, configuration and diagnose of transmitter and performer.
3.1.4 The electric operator provided in complete set should be adopted with integration form.
3.1.5 The parameter setting requirements and control protection requirements for generator body and hydrogen, oil, water system shall be proposed in written documents. The measuring points of parameters shall include detailed descriptions of type, form specifications, precision and function. Control and protection requirements shall include control, protection, interlock, self regulating description and relevant logic block diagram and shall conform to relevant safety code.

Foreword I
1 Scope
2 Normative Reference
3 Technical Requirements
4 Equipment Requirements
5 Test and Acceptance
6 Technical Documents and Drawings

Sample only — not a preview of DL/T 591-2010
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.