DL/T 827-2014 in English
VALIDStart-up Test Code for Bulb Turbine and Generator Units
- Issued on:2014-03-18
- Implemented on:2014-08-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$418.00
Scope
This standard specifies the start-up and trial operation test procedures and requirements for bulb tubular units with a single unit of more than 5MW and a runner diameter of more than 2.5m. This standard is applicable to the start-up trial operation test and handover acceptance of tubular turbine generator units and related equipment in hydropower stations. The start-up trial operation test of other cross-flow units can refer to this standard.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

DL/T 790.12-2001 in English
Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications
2001-12-26 -

DL/T 646-1998 in English
Technical specification of manufacturing steel transmission pole structures
1998-03-19