Hydrogenerator performance
Hydrogenerator performance, Total:237 items.
The international standard classification for "Hydrogenerator performance" includes: Generating sets , Hydraulic energy engineering , Wind turbine systems and other alternative sources of energy , Electrical engineering in general , Generators , Components for rotating machines , Gas and steam turbines, Steam engines , Power stations in general , Other agricultural machines and equipment .
The Chinese standard classification for "Hydrogenerator performance" includes: Generating unit , Electrical construction installation engineering , Electric power system equipment installation testing , Electric rotating machinery in general , Wind energy , Water turbine and its auxiliary equipment , Synchronous machine , , Other generating equipment , Steam turbine and its auxiliary equipment , Power plant and electric power system operating maintenance .
Group Standards of the People's Republic of China
- T/CSEE 0175-2021 Vacuum checking method and evaluation for sealing of water circuit within the winding of turbo generator
- T/CEC 5087-2023 Technical Specifications for Laser Tracking Measurement of Hydrogenerator Set Installation
- T/ZZB 2821-2022 Turbine generators
- T/CWCS 0003-2024 Operational standards for monitoring and controlling small hydro-generator units
- T/CWCS 0010-2024 Operational monitoring standard for small hydro-generator units
- T/CEEIA 709-2023 Technical guide of predicting the trend of stability deterioration for Hydro-generator units shaft systems
- T/CSEE 0347-2022 Dynamic balancing test procedures for hydro-turbine generator sets
- T/CEEIA 762-2023 Technical guidelines for fault diagnosis modules of intelligent operation and maintenance systems for hydrogenerator unit
- T/CEEIA 237-2016 Specifications for main shaft forgings of large hydroelectric generating units
- T/ZZB 2818-2022 Francis turbine for small hydro generator unit
- T/CEEIA 590-2022 The guide for residual life assessment for the francis , kaplan hydro-generator units
- T/CSEE 0194-2021 Technical guide of vibration condition evaluation and diagnosis for Hydro-generating units
Professional Standard - Water Conservancy
- SL 668-2014 Guide of thrust bearing and guide bearing installation and adjustment technology for hydrogenerating unit
- SL 397-2007 Integral micro hydroturbine generating unit
- SL 573-2012 Specification of operating maintenance for bulb turbine and generator units
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
- GB/T 19073-2003 Gearbox of with turbine generator system
- GB/T 32715-2016(英文版) Integral micro hydroturbine generator unit
- GB/T 7894-2023 Fundamental technical requirements for hydrogenerators
- GB/T 28570-2012 Technical guide of on-line condition monitoring system for hydraulic turbine and generator units
- GB/T 8564-2023 Technical specification for installation of hydraulic turbine-generator unit
- GB/T 25383-2010 Wind turbine generator system—Rotor blades
- GB/T 19073-2008 Gearbox of wind turbine generator systems
- GB/T 28545-2012 Guideline for rehabilitation and performance improvement for Hydraulic turbines,storage pumps and pump-turbines
- GB/T 8564-2003 Specification for Installation of Hydraulic Turbine Generator Uni
- GB/T 32715-2016 Integrated micro - hydro - generating units
- GB/T 20043-2005 Field acceptance test to determine the hydraulic performance of hydraulic turbine,storage pumps and pump-turbines
- GB/T 7894-2009 Fundamental technical specifications for hydro generators
- GB/T 28545-2023 Directives for rehabilitation and performance improvement for hydraulic turbines|| storage pumps and pump-turbines
- GB/T 2900.45-1996 Electrotechnical terminology Hydraulic turbine, storage pump and pump-turbine
- GB/T 7441-1987 Noise measurement method for the power plant turbine generator
- GB/T 32584-2016 Evaluation of mechanical vibration for machine sets in hydraulic power plants and pump-storage plants
- GB/T 43683.2-2024 Guidance for installation procedures and tolerances of hydroelectric machines—Part 2: Vertical generators
- GB/T 7894-2001 Fundamental Technical Specifications for Hydro Generators
- GB/T 43683.1-2024 Guidance for installation procedures and tolerances of hydroelectric machines—Part 1:General aspects
- GB 8564-1988 Specification for installation of hydraulic-turbine and generator units
Professional Standard - Electricity
- DL/T 2287-2021 Guide for electric braking of hydro-generators
- DL/T 556-2016 Guide for setting vibration monitoring device for hydraulic turbine generator set
- DL/T 1067-2020 Fundamental technical specification for evaporative cooling hydro generators
- DL/T 1760-2017 Guidelines for factory inspection of reversible hydroelectric generating units and their auxiliary equipment
- DL/T 751-2014 Code for Operation of Hydraulic Turbine Generator
- DL/T 1055-2007 Technical supervision guide for trubine in power plants
- DL/T 1197-2023 Specification of on-line condition monitoring system for hydro-generator set
- DL/T 793.5-2018 Reliability evaluation code for generating equipment Part 5:Gas-turbine units
- DL/T 556-1994 Guide for vibration monitoring device setting of hydraulic turbine generator set
- DL/T 507-2002 Start-up Test Code for Hydraulic-turbine and Generator Units
- DL/T 730-2000 Specifications for imported equipment of hydro-generators and generator-motors
- DL/T 751-2001 Code for hydraulic turbine generator
- DL/T 1804-2018 Specifications for Vibration Swing Devices of Hydrogenerator Sets
- DL/T 1197-2012 Specification of On-line Condition Monitoring System for Hydro-generator Set
- DL/T 1067-2007 Fundamental technical specifications for evaporative cooling hydrogenerator (generator/motor)
- DL/T 2156-2020 Integral Performance Test Regulations for Thermal Power Generating Sets
- DL/T 1616-2016 Guide Rule for Property Test of Thermal Power Generating Units
- DL/T 607-1996 Test on water leakage or hydrogen leakage of Steam - Turbine Generator
- DL/T 507-2014 Testing Regulations for Hydroelectric Generating Set Start-up
- DL/T 2570-2022 Technology supervision guide for hydraulic turbines of hydropower plant
- DL/T 1003-2006 The measurement of lubricating parameters for thrust bearing of hydro-generator unit
- DL/T 2286-2021 Guide for performance test and evaluation of excitation control system of large hydro-generator
- DL/T 5858-2022 Guideline for installation technology of pelton hydro generating units
- DL/T 2577-2022 Maintenance code for Kaplan hydro-turbine generating units
- DL/T 443-2016 Guide for factory inspection of hydraulic turbine generator unit and its auxiliary equipment
- DL 443-1991 General Requirements for Delivery Inspection of Hydro-generator Units
- DL 507-1993 Regulations for start-up test of hydro-generator set
- DL/T 5038-1994 Guide for installation technology of bulb turbine hydrogenerator unit
- DL/T 2578-2022 Start-up test code for impulse hydro-generating units
- DL/T 2575-2022 Guide for stator technology refurbishment of bulb hydro generator
- DL/T 751-2014(英文版) Hydrogenerator operating procedures
- DL/T 827-2002 Start-up test code for bulb turbine and generator units
- DL/T 5038-2012 Technological code for installation of bulb turbine generator units
- DL/T 2258-2021 Technical specification for coupled dynamic monitoring of power house structure and hydraulic turbine-generator unit
- DL/T 827-2014 Start-up Test Code for Bulb Turbine and Generator Units
- DL/T 1197-2012(英文版) Technical conditions of online monitoring system for hydro-generator unit status
- DL/T 793.4-2019 Reliability evaluation code for generating equipment-Part 4:Pumped-storage units
水利部
- SL/T 668-2014 Technical Guidelines for Installation and Adjustment of Thrust Bearings and Guide Bearings of Hydraulic Generator Units
- SL/T 746-2016 Start-up test procedures for small and medium-sized hydroelectric generator sets
中华人民共和国国家质量监督检验检疫总局、中国国家标准化管理委员会
- GB/T 35709-2017 Maintenance regulation for bulb hydro-turbine generating units
- GB/T 19073-2018 Wind turbine—Design requirements for gearbox
- GB/T 36043-2018 Specification of large-scale steam turbine-generator shafting dynamic characteristics
未注明发布机构
- IEEE Std 1207-2011 IEEE Guide for the Application of Turbine Governing Systems for Hydroelectric Generating Units
国家能源局
- NB/T 10830-2021 Specification of main shaft forgings for large hydro-generator set
- NB/T 42161-2018 Technical requirements for electronic load controller of micro & mini sized hydro turbine generator unit
- NB/T 10270-2019 Performance acceptance test code on geothermal power unit
- NB/T 10661-2021 Wind turbines. Rotor lock
Professional Standard - Post and Telecommunication
- YD/T 1269-2003 Gas turbine generator sets for telecommunications
- YD/T 1269-2012 Gas turbine generator sets for telecommunications
Professional Standard - Machinery
- JB/T 3334.2-2000 Brake for hydraulic generator Part 2: Brake for horizontal shaft turbine-generator unit
- JB/T 1270-2002 Specification for Shaft Forgings for Hydroturbines and Hydrogen
- JB/T 6228-2014 Checking Methods and Evaluation of Water Circuit within the Winding of Turbo Generator
- JB/T 3334.1-2000 Brake for hydraulic generator Part 1: Brake for vertical shaft hydraulic generator
- JB/T 6228-1992 Inspection method and evaluation of internal water system of steam turbine generator winding
- JB/T 1270-2014 Shaft Forgings for Hydraulic Turbines and Hydraulic Generators - Technical Specification
- JB/T 6228-2005 Checking methods and evaluation of water circuit within the winding of turbo generator
- JB/T 3334.2-2013 Brake for hydro generators - Part 2: Horizontal brake for hydro generators
- JB/T 10194-2000 Rotor blades of wind turbine
- JB/T 1270-1993 Specifications for large shaft forgings of hydraulic turbines and hydroelectric generators
- JB/T 3334.1-2013 Brake for hydro generators - Part 1: Vertical brake for hydro generators
- JB/T 10399-2004 Rotor blades for off grid wind turbine generator system
Professional Standard - Energy
- DL/T 5603-2021 Code for design of turbine-generator and auxiliary system of solar thermal power plant
- DL/T 2592-2023 Code for type test of large size francis hydropower units
- NB/T 25015-2013 Guideline for Turbine-generator Commissioning of Nuclear Power Plant
Professional Standard - Aerospace
- QJ 2885-1997 General Specification for Gas Turbine Generator Unit
Guizhou Provincial Standard of the People's Republic of China
- DB52/T 792-2013 Guidelines for maintenance and management of mineral oil used in the operation of hydroelectric generating units in Guizhou
Professional Standard - Hydroelectric Power
- SD 288-1988 Technical Guidance for Installation and Adjustment of Thrust Bearing and Guide Bearing of Hydraulic Turbine Generator Units
Shanghai Provincial Standard of the People's Republic of China
- DB31/T 507-2021 Energy consumption index per unit product of coal-fired condensing steam turbine generator set
IEEE - The Institute of Electrical and Electronics Engineers@ Inc.
- IEEE 1207-2004 Guide for the Application of Turbine Governing Systems for Hydroelectric Generating Units
- IEEE 1207-2011 Guide for the Application of Turbine Governing Systems for Hydroelectric Generating Units
- IEEE 122-1985 RECOMMENDED PRACTICE FOR FUNCTIONAL AND PERFORMANCE CHARACTERISTICS OF CONTROL SYSTEMS FOR STEAM TURBINE-GENERATOR UNITS
American Society of Mechanical Engineers (ASME)
- ASME PTC 29-2005(R2020) Speed Governing Systems for Hydraulic Turbine Generator Units
- ASME PTC 20.2-1965(R1986) Overspeed Trip Systems of Steam Turbine-Generator Units
- ASME PTC 55-2013 Gas Turbine Aircraft Engines
- ASME PTC 20.3-1970 Pressure control systems used on steam turbine-generator units
SCC
- ASME PTC-29-2005(R2020) Speed Governing Systems for Hydraulic Turbine Generator Units
- SPC GB/T 32715-2016
- BS EN IEC 61400-12-1:2017 Wind energy generation systems-Power performance measurement of electricity producing wind turbines
- BS EN IEC 61400-12-2:2013 Wind turbines-Power performance of electricity-producing wind turbines based on nacelle anemometry
- NS-EN 45510-5-4:1998 Guides for procurement of power station equipment — Part 5-4: Hydraulic turbines, storage pumps and pump-turbines
- DANSK DS/EN 62256:2017 Hydraulic turbines, storage pumps and pump-turbines – Rehabilitation and performance improvement
- CEI EN 62256:2018 Hydraulic turbines, storage pumps and pump-turbines - Rehabilitation and performance improvement
- IEC 60029:1914 Prime movers for electrical plant - Nomenclature of hydraulic turbines
- AWWA ACE92233 Turbine Generators Provide Flexibility and Energy Management
- CEI EN IEC 61400-12-1:2023 Wind energy generation systems Part 12-1: Power performance measurement of electricity producing wind turbines
- AS C38:1932 Electrical performance of alternators of the steam turvine driven type
- AS C38:1927 Electrical performance of alternators of the steam turvine driven type
- DANSK DS/EN IEC 61400-12:2022 Wind energy generation systems – Part 12: Power performance measurements of electricity producing wind turbines – Overview
- CAN/CSA-IEC 61400-12-1-2017 Wind energy generation systems — Part 12-1: Power performance measurements of electricity producing wind turbines
- DANSK DS/EN IEC 61400-12-1:2022 Wind energy generation systems – Part 12-1: Power performance measurements of electricity producing wind turbines
- CEI EN IEC 61400-12:2023 Wind energy generation systems Part 12: Power performance measurements of electricity producing wind turbines - Overview
- DANSK DS/EN 60041:1995 Field acceptance tests to determine the hydraulic performance of hydraulic turbines, storage pumps and pump-turbines
- CEI EN 60041:1997 Field acceptance tests to determine the hydraulic performance of hydraulic turbines, storage pumps and pump-turbines
- 04/30126605 DC IEC 62256 ED.1. Hydraulic turbines, storage pumps and pump-turbines. Guide for rehabilitation and performance improvement
- UNE-EN 61400-12:1999 WIND TURBINE GENERATOR SYSTEMS. PART 12: WIND TURBINES POWER PERFORMANCE TESTING.
- CAN/CSA C61400-12-1-2007(R2012) Wind Turbines - Part 12-1: Power Performance Measurements of Electricity Producing Wind Turbines
- DANSK DS/EN 61400-12-1:2006 Wind turbines – Part 12-1: Power performance measurements of electricity producing wind turbines
- CAN/CSA-C61400-12-1-2007(R2012) Wind Turbines - Part 12-1: Power Performance Measurements of Electricity Producing Wind Turbines
- CEI EN 61400-21:2011 Wind turbines Part 21: Measurement and assessment of power quality characteristics of grid connected wind turbines
- BS PD IEC TS 62257-7-2:2022 Renewable energy and hybrid systems for rural electrification-Generator set. Off-grid wind turbines
NEMA - National Electrical Manufacturers Association
- NEMA HT 4-1958 Determination of WR2 for Hydraulic Turbine Generator Units
- NEMA MG 5.2-1972 Installation of Vertical Hydraulic-Turbine-Driven Generators and Reversible Generator/Motors for Pumped Storage Installations (Includes Correction: 10/10/1975)
- NEMA SM 24-1985 LAND BASED STEAM TURBINE GENERATOR SETS 0 TO 33@000 KW (***NO LONGER VALID - REFERENCE ONLY***)
GSO
- DL/T 2733-2024 Performance test procedures for vibration and pressure pulsation sensors of hydro-generator sets
- NB/T 11485-2024 Technical specification for pipeline integrated hydro-turbine generator set
- DL/T 443-1991 General regulations for factory inspection of hydro-generator equipment
- BH GSO IEC 62256:2016 Hydraulic turbines, storage pumps and pump-turbines - Rehabilitation and performance improvement
- DL/T 1003-2024 Measurement method of lubrication parameters of thrust bearing of hydro-turbine generator set
- OS GSO IEC 60041:2014 Field acceptance tests to determine the hydraulic performance of hydraulic turbines, storage pumps and pump-turbines
- OS GSO IEC 61400-12-1:2013 Wind turbines - Part 12-1: Power performance measurements of electricity producing wind turbines
- NB/T 11587-2024 Wind turbine gearbox test specification
- GSO IEC 61400-12-1:2013 Wind turbines - Part 12-1: Power performance measurements of electricity producing wind turbines
HU-MSZT
- MNOSZ 21802-1955 Main condition parameters of steam turbine in condensing power plant and production capacity of steam turbine generator unit
Institute of Electrical and Electronics Engineers (IEEE)
- IEEE 122-1991 Recommended Practice for Functional and Performance Characteristics of Control Systems for Steam Turbine-Generator Units
- IEEE Std 1207-2011 (Revision to IEEE Std 1207-2004) IEEE Guide for the Application of Turbine Governing Systems for Hydroelectric Generating Units
- IEEE Std 122-1985 IEEE Recommended Practice for Functional Performance Characteristics of Control Systems for Steam Turbine-Generator Units
- IEEE Std 1207-2011 (Revision to IEEE Std 1207-2004 IEEE Guide for the Application of Turbine Governing Systems for Hydroelectric Generating Units
- IEEE Std 1207-2004 IEEE Guide for the Application of Turbine Governing Systems for Hydroelectric Generating Units
- IEEE Std 122-1991 IEEE Recommended Practice for Functional and Performance Characteristics of Control Systems for Steam Turbine-Generator Units
- IEEE Std 1207-2011 (Revision to IEEE Std 1207-2004) - Redline IEEE Guide for the Application of Turbine Governing Systems for Hydroelectric Generating Units - Redline
British Standards Institution (BSI)
- BS DD IEC/TS 61400-26-1:2011 Wind turbines. Time-based availability for wind turbine generating systems
- BS EN 61400-12-1:2006 Wind turbines - Power performance measurements of electricity producing wind turbines
- BS EN IEC 61400-12:2022 Wind energy generation systems - Power performance measurements of electricity producing wind turbines. Overview
- BS EN 61400-12-2:2013 Wind turbines. Power performance of electricity-producing wind turbines based on nacelle anemometry
- BS EN 45510-5-4:1998 Guide for the procurement of power station equipment - Hydraulic turbines, storage pumps and pump-turbines
- BS EN IEC 61400-12-1:2022 Wind energy generation systems - Power performance measurements of electricity producing wind turbines
- BS EN 62256:2008 Hydraulic turbines, storage pumps and pump-turbines - Rehabilitation and performance improvement
- BS ISO 18888:2017 Gas turbine combined cycle power plants. Thermal performance tests
CH-SNV
- SNV 742 402.5-1966 Principle of speed adjustment of hydraulic turbine generator set
US-COE
- COE ETL 1110-2-317-1990 SELECTING REACTION-TYPE HYDRAULIC TURBINES AND PUMP TURBINES AND HYDROELECTRIC GENERATORS AND GENERATOR-MOTORS CORRECTED COPY
American National Standards Institute (ANSI)
- ANSI/IEEE 122:1992 Recommended Practice for Functional Performance Characteristics of Control Systems for Steam Turbine Generator Units
- ANSI/ASME PTC29-2005 Speed Governing Systems for Hydraulic Turbine Generator Units
- ANSI/ARESCA 61400-12-1:2023 Wind energy generation systems - Part 12-1: Power performance measurement of electricity producing wind turbines
- BS EN IEC 61400-12-2:2022 Wind energy generation systems Power performance of electricity producing wind turbines based on nacelle anemometry (British Standard)
RU-GOST R
- GOST R 55621-2013 Guide for procurement of power station equipment. Part 5-4. Turbines-hydraulic turbines, storage pumps and pump-turbines
- GOST R 55003-2012 Hydraulic turbines, storage pumps and pump-turbines. Rehabilitation and performance improvement
- GOST R 54418.12.1-2011 Wind turbines. Power performance measurements of electricity producing wind turbines
- GOST 5616-1989 Water-wheel type generators and motor-generators. General specifications
Association Francaise de Normalisation
- NF EN IEC 60034-33:2022 Machines électriques tournantes - Partie 33 : hydro-génératrices synchrones y compris les groupes moteur-générateurs - Exigences spécifiques
- NF EN 45510-5-4:1998 Guide for the acquisition of equipment intended for electricity production plants - Part 5-4: turbines. Hydraulic turbines, storage pumps, pump turbines
- NF C57-700-12:2006 Wind turbine generator systems - Part 12 : wind turbines power performance testing.
- NF C55-456*NF EN 62256:2017 Hydraulic turbines, storage pumps and pump-turbines - Rehabilitation and performance improvement
- NF C55-456:2008 Hydraulic turbines, storage pumps and pump-turbines - Rehabilitation and performance improvement.
- NF C55-401*NF EN 60041:2014 Field acceptance tests to determine the hydraulic performance of hydraulic turbines, storage pumps and pumps-turbines
- NF C57-700-12-1*NF EN 61400-12-1:2017 Wind energy generation systems - Part 12-1 : power performance measurements of electricity producing wind turbines
- NF EN 62256:2017 Turbines hydrauliques, pompes d'accumulation et pompes turbines - Réhabilitation et amélioration des performances
American Gear Manufacturers Association
- AGMA 99FTM11-1999 Performance of Nitrided Gears in High Speed Epicyclic Gearbox Used in Gas Turbogenerators - a Case Study
KR-KS
- KS C IEC 62256-2023 Hydraulic turbines, storage pumps and pump-turbines — Rehabilitation and performance improvement
- KS C IEC 60041-2023 Field acceptance tests to determine the hydraulic performance of hydraulic turbines, storage pumps and pump-turbines
- KS C IEC 61400-12-1-2008(2023) Wind turbines-Part 12-1:Power performance measurements of electricity producing wind turbines
International Electrotechnical Commission (IEC)
- IEC 62256:2017 RLV Hydraulic turbines, storage pumps and pump-turbines - Rehabilitation and performance improvement
- IEC 61400-12:1998 Wind turbine generator systems - Part 12: Wind turbine power performance testing
- IEC 62256:2017 Hydraulic turbines, storage pumps and pump-turbines - Rehabilitation and performance improvement
- IEC 62256:2008 Hydraulic turbines, storage pumps and pump turbines - Rehabilitation and performance improvement
- IEC 60041:1991 Field acceptance tests to determine the hydraulic performance of hydraulic turbines, storage pumps and pump-turbines
- IEC 60041:1991/COR1:1996 Field acceptance tests to determine the hydraulic performance of hydraulic turbines, storage pumps and pump-turbines
- IEC 61400-12-1:2022 Wind energy generation systems - Part 12-1: Power performance measurement of electricity producing wind turbines
- IEC 61400-12-1:2017 RLV Wind energy generation systems - Part 12-1: Power performance measurements of electricity producing wind turbines
- IEC 61400-12:2022 Wind energy generation systems - Part 12: Power performance measurements of electricity producing wind turbines - Overview
- IEC 61400-1:1994 Wind turbine generator systems - Part 1: Safety requirements
- IEC 61400-12-1:2017/COR3:2021 Wind energy generation systems - Part 12-1: Power performance measurements of electricity producing wind turbines; Corrigendum 3
ES-UNE
- UNE-EN 62256:2017 Hydraulic turbines, storage pumps and pump-turbines - Rehabilitation and performance improvement (Endorsed by Asociación Española de Normalización in October of 2017.)
- UNE-EN 61400-12-1:2018/AC:2019-12 Wind energy generation systems - Part 12-1: Power performance measurement of electricity producing wind turbines
- UNE-EN 61400-12-1:2018/AC:2021-06 Wind energy generation systems - Part 12-1: Power performance measurement of electricity producing wind turbines
European Committee for Electrotechnical Standardization(CENELEC)
- EN 62256:2008 Hydraulic turbines, storage pumps and pump-turbines - Rehabilitation and performance improvement
- EN 62256:2017 Hydraulic turbines, storage pumps and pump-turbines - Rehabilitation and performance improvement
- EN IEC 61400-12-1:2022 Wind energy generation systems - Part 12-1: Power performance measurements of electricity producing wind turbines
Korean Agency for Technology and Standards (KATS)
- KS C IEC 61400-12:2004 Wind turbine generator systems-Part 12:Wind turbine power performance testing
- KS C IEC 61400-12:2015 Wind turbine generator systems-Part 12:Wind turbine power performance testing
- KS C IEC 61400-12-2015 Wind turbine generator systems-Part 12:Wind turbine power performance testing
- KS C IEC 61400-12-2004(2014) Wind turbine generator systems-Part 12:Wind turbine power performance testing
- KS C IEC 61400-2:2004 Wind turbine generator systems-Part 2:Safety of small wind turbines
- KS C IEC 61400-2:2014 Wind turbines — Part 2: Small wind turbines
- KS C IEC 61400-21-2023 Wind turbines-Part 21:Measurement and assessment of power quality characteristics of grid connected wind turbines
- KS C IEC 61400-12-1-2023 Wind turbines-Part 12-1:Power performance measurements of electricity producing wind turbines
US-FCR
- FCR COE ETL 1110-2-317-1990 SELECTING REACTION-TYPE HYDRAULIC TURBINES AND PUMP TURBINES AND HYDROELECTRIC GENERATORS AND GENERATOR-MOTORS CORRECTED COPY
- FCR COE CWGS 16251-1993 EXCITATION SYSTEM RETROFITS HYDRO-TURBINE AC GENERATORS
Indonesia Standards
- SNI IEC 61400-12-1:2016 Turbin - Bagian 12-1: Pengukuran kinerja daya listrik yang dihasilkan oleh turbin angin
- SNI IEC 62256:2012 Hydraulic turbines, storage pumps and pump-turbines - Rehabilitation and performance improvement
CZ-CSN
- CSN 35 0230-1984 Turbo-alternators and hydroelectric alter-nators. Testing methods
SAE - SAE International
- SAE AS272-2004 DEFINITIONS@ AIRCRAFT TURBINE ENGINE PERFORMANCE
Underwriters Laboratories (UL)
- UL SUBJECT 3200-2008 OUTLINE OF INVESTIGATION FOR PERFORMANCE TESTING OF ENGINE AND TURBINE GENERATORS (Issue 2)
- UL SUBJECT 3200-2005 Outline of Investigation for Performance Testing of Engine and Turbine Generators (Issue 1)
German Institute for Standardization
- DIN EN 45510-5-4:1998 Guide for procurement of power station equipment - Part 5-4: Hydraulic turbines, storage-pumps and pump-turbines; German version EN 45510-5-4:1998
Japanese Industrial Standards Committee (JISC)
- JIS C 1400-12 ERRATUM 1:2002 Wind turbine generator systems -- Part 12: Wind turbine power performance testing (Erratum 1)
Society of Automotive Engineers (SAE)
- SAE ARP755-1991 TURBINE ENGINE PERFORMANCE STATION NUMBERING
- SAE AMS1551B-2023 Cleaner, Turbine Engine Gas Path Aqueous Type
- SAE AMS1380A-1992 Scale Conditioner, Alkaline Aircraft Turbine Engine Components
GOST
- GOST R 55562-2022 Hydraulic turbines, storage pumps and pump-turbines. Cavitation pitting evaluation. Part 1. Evaluation in reaction turbines, storage pumps and pump-turbines
Danish Standards Foundation
- DS/EN 62256:2008 Hydraulic turbines, storage pumps and pump-turbines - Rehabilitation and performance improvement
- DS/EN 61400-12-1:2006 Wind turbines – Part 12-1: Power performance measurements of electricity producing wind turbines
International Organization for Standardization (ISO)
- ISO 18888:2017 Gas turbine combined cycle power plants — Thermal performance tests
PL-PKN
- PN-EN 61400-12-1-2017-07/AC-2021-07 E Wind energy generation systems -- Part 12-1: Power performance measurement of electricity producing wind turbines
AENOR
- UNE-EN 60041:1998 FIELD ACCEPTANCE TESTS TO DETERMINE THE HYDRAULIC PERFORMANCE OF HYDRAULIC TURBINES, STORAGE PUMPS AND PUMP-TURBINES.
- UNE-EN 62256:2010 Hydraulic turbines, storage pumps and pump-turbines - Guide for rehabilitation and performance improvement
European Committee for Standardization (CEN)
- EN 45510-5-4:1998 Guide for procurement of power station equipment - Part 5-4: Hydraulic turbines, storage, pumps and pump-turbines
U.S. Air Force
- AIR FORCE MIL-DTL-38195 D-2000 GENERATOR SET, GAS TURBINE ENGINE, 60 KW 400 HZ, GENERAL PURPOSE
CENELEC - European Committee for Electrotechnical Standardization
- EN 61400-12:1998 Wind Turbine Generator Systems Part 12: Wind Turbines Power Performance Testing
Standard Association of Australia (SAA)
- IEC 61400-12-0:1998 Wind turbine generator systems — Part 12: Wind turbine power performance testing
GOSTR
- GOST R 58990-2020 Turbines of aircraft gas turbine engines. The method of calculation of turbine characteristics at the middle diameter
ESDU - Engineering Sciences Data Unit
- ESDU 74042-1974 Non-dimensional methods for the measurement of level-flight performance of turbine-engined helicopters.
Lithuanian Standards Office
- LST EN 62256-2008 Hydraulic turbines, storage pumps and pump-turbines - Rehabilitation and performance improvement (IEC 62256:2008)
Regulations for Overhaul of Bulb Tubular Hydrogenerator Units,Turbine generator set operation,Operation and Maintenance of Bulb Tubular Hydrogenerator Set,Start-up test procedure for bulb tubular hydro-generator set,Hydrogenerator set