DL/T 852-2004 in English
SUPERSEDEDGuide for boiler start-up commissioning test
- Issued on:2004-03-09
- Implemented on:2004-06-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$379.00
| Standard No: | DL/T 852-2004 |
| Document status: | SUPERSEDED |
| Superseded by: |
DL/T 852-2016 Guide for Boiler Start-up Commissioning Test
|
| Superseded on: | 2016-12-01 |
| Title in English: | Guide for boiler start-up commissioning test |
| Title in Chinese: | 锅炉启动调试导则 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2004-03-09 |
| Implemented on: | 2004-06-01 |
| ICS Classification: | 27.100-Power stations in general |
| Chinese Classification: | F22-Electric power system equipment installation testing |
| Professional Classification: | DL-Electricity |
| Related Keywords: | boiler units
start-up phase test scopethis standard boiler start-up |
| Related Topics: | debugging
Open Tube Furnace promoter regulatory element dl/t 852 promoter regulatory element promoter regulatory element start up dl/t852 start Initiation and regulation Unable to start labsolutions dl/t 887 2004 |
本标准规定了新建、扩建和改建火电机组的锅炉和主要辅机设备分系统试运和机组整套启动阶段即锅炉的点火、升温、升压、带负荷调试的操作要领和技术指南。
本标准适用于国产400t/h (100MW 级)及以上容量的锅炉;对于其他类型和容量的锅炉机
组,可参照本标准执行。
Scope
This standard specifies the operating essentials and technical guidelines for the commissioning of subsystems of boilers and main auxiliary equipment of newly built, expanded and renovated thermal power units and the start-up phase of the entire unit, that is, the boiler's ignition, temperature rise, pressure increase, and load debugging. This standard is applicable to domestic boilers with a capacity of 400Uh (100MW class) and above. For boiler units of other types and capacities, this standard can be referred to.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

DL/T 5403-2007 in English
Specification for commissioning and quality acceptance and evaluation of flue gas desulphurization for coal-fired power plant
2007-12-03 -

DL/T 782-2001 in English
Code of start-up & completion acceptance for power transmission & distribution project of 110kV and above
2001-10-08