DL/T 894-2004 in English
SUPERSEDEDGuide of commissioning for ash and slag handling system in power plant
- Issued on:2004-10-20
- Implemented on:2005-04-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
Price(USD):
$210.00
$204.00
$204.00
| Standard No: | DL/T 894-2004 |
| Document status: | SUPERSEDED |
| Superseded by: |
DL/T 894-2018 Gide of commissioning for ash and slag handling system in power plant
|
| Superseded on: | 2018-07-01 |
| Title in English: | Guide of commissioning for ash and slag handling system in power plant |
| Title in Chinese: | 除灰除渣系统调试导则 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2004-10-20 |
| Implemented on: | 2005-04-01 |
| ICS Classification: | 27.100-Power stations in general |
| Chinese Classification: | F23-Power plant and electric power system operating maintenance |
| Professional Classification: | DL-Electricity |
| Related Keywords: | slag handling system
power plant slag plant power |
| Related Topics: | debugging
system debugging slag Ash Percentage of slag ash Water System Degassing Northeast slag remover dl/t894 Haze system Haze system as894 outgassing Composition of ash Biomass ash System trial run Slag remover international Casting slag remover dl/t 887 2004 |
本标准规定了火力发电厂除灰除渣系统启动调试的内容和方法。
本标准适用于单机额定容量为125MW 及以上燃煤火电机组的新建、扩建和改建工程中除灰除渣系统的调试。单机额定容量125MW以下的燃煤火电机组的除灰除渣系统的调试可参照执行。
Sample only — not a preview of DL/T 894-2004

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

DL/T 2506-2022 in English
Technical guidelines for energy-saving operation optimization of environmental protection facilities in coal-fired power plants
2022-05-13 -

DL/T 956-2017 in English
Guide for lay-up of thermal power equipment in fossil fuel power plant
2017-08-02