Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
slag handling system slag removal systems power plant introductionthis standard system preparation slag potentiometric titration method water inflow rates microfilm cameras
DL/T 894-2018 in English

DL/T 894-2018 in English

VALID

Gide of commissioning for ash and slag handling system in power plant

  • Issued on:2018-04-03
  • Implemented on:2018-07-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $310.00
$301.00
Standard No: DL/T 894-2018
Document status: VALID
Title in English: Gide of commissioning for ash and slag handling system in power plant
Title in Chinese: 除灰除渣系统调试导则
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2018-04-03
Implemented on: 2018-07-01
Superseding: DL/T 894-2004 Guide of commissioning for ash and slag handling system in power plant
Professional Classification: DL-Electricity
Related Keywords: slag handling system
slag removal systems
power plant introductionthis standard
system preparation
slag
Related Topics: system debugging
Percentage of slag ash
Water System Degassing
Northeast slag remover
dl/t894
Haze system
Haze system
as894
Composition of ash
Biomass ash
Slag remover international
Casting slag remover


Introduction

This standard provides guidance on the commissioning process of ash and slag removal systems. It outlines the procedures and requirements for testing and commissioning these systems to ensure their proper operation. The document covers various aspects such as system preparation, testing methods, and operational checks. It also includes recommendations for documentation and safety measures during the commissioning phase. The standard is structured to assist engineers and technicians in achieving reliable and efficient performance of ash and slag removal systems. It defines key terms and specifies the scope of application for different types of systems. The content is intended to support the implementation and maintenance of these systems in accordance with established practices.

*** Please note: This description may not be accurate, please refer to the official documentation.

Sample only — not a preview of DL/T 894-2018
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • DL/T 377-2010 in English

    DL/T 377-2010 in English

    The acceptance tests of high voltage direct current equipment

    2010-05-01
  • DL/T 790.12-2001 in English

    DL/T 790.12-2001 in English

    Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications

    2001-12-26
  • DL/T 5161.13-2018 in English

    DL/T 5161.13-2018 in English

    Specification for construction quality checkout and evaluation of electric equipment installation-Part 13:Power current conversion equipment

    2018-12-25