Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
priority power supply preferred power supply current power supply nuclear power plants nuclear power plants scopethis standard floor safety direction line slotted pan head screws medical gas pressure regulator family
GB/T 13177-2000 in English

GB/T 13177-2000 in English

SUPERSEDED

STANDARD for preferred power supply for nuclear power plants

  • Issued on:2000-01-03
  • Implemented on:2000-08-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $220.00
$214.00
Standard No: GB/T 13177-2000
Document status: SUPERSEDED
Superseded by: GB/T 13177-2008 Preferred power supply for nuclear power plants
Superseded on: 2009-08-01
Title in English: STANDARD for preferred power supply for nuclear power plants
Title in Chinese: 核电厂优先电源
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2000-01-03
Implemented on: 2000-08-01
ICS Classification: 27.120.20-Nuclear power plants. Safety
Chinese Classification: F83-Distribution equipment for reactor and nuclear power plant safety
Professional Classification: GB-National Standard
Related Keywords: priority power supply
preferred power supply
current power supply
nuclear power plants
nuclear power plants scopethis standard
Related Topics: priority energy
nuclear power
nuclear power standards
High quality signal source
High-quality manufacturers
Water saving priority
Yeast priority
excellent
america first
GBT13177
GB/T 13177-2000
GB/T 13177-2008
power supply
Nuclear power advanced technology
Yuanjian Youke
Factory backup power standard
Priority valve test

《GB/T 13177-2000核电厂优先电源》由TC30(全国核仪器仪表标准化技术委员会)归口,主管部门为国家标准化管理委员会。
本标准规定了核电厂优先电源(PPS)和优先电源与安全级(1E级)电力系统、开关站、输电系统以及替代交流电源(AAC)接口的设计准则。


Scope

This standard specifies the design criteria for priority power supply (PPS) and priority power supply and safety level (level 1E) power system, switchyard, power transmission system and interface of alternative alternating current power supply (AAC) in nuclear power plants.

Sample only — not a preview of GB/T 13177-2000
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • GB/T 13284-2025 in English

    GB/T 13284-2025 in English

    Design criteria of safety systems in nuclear power plants

    2025-04-25
  • GB/Z 111-2025 in English

    GB/Z 111-2025 in English

    Guide for selection and use of lead acid battery monitoring system in stationary applications of nuclear power plant

    2025-12-03
  • GB/T 43532-2023 in English

    GB/T 43532-2023 in English

    Cybersecurity controls for instrumentation and control systems of nuclear power plants

    2023-12-28
  • GB/T 36041-2018 in English

    GB/T 36041-2018 in English

    Monitoring criteria for variable important to safety in nuclear power plants for pressurized water reactors

    2018-03-15
  • GB/T 9225-2022 in English

    GB/T 9225-2022 in English

    Application guidelines of reliability analysis in nuclear power generating station systems and other nuclear facilities

    2022-12-30
  • GB/T 7166-2015 in English

    GB/T 7166-2015 in English

    Characteristics and test methods for in-core and primary coolant circuit temperature sensors in nuclear power plants

    2015-10-09