Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
distric power networks district power networks power supply network automation systems other power supply networks ant design rabbit myxoma commemorate envelope
GB/T 13730-2002 in English

GB/T 13730-2002 in English

VALID

Dispatching automation systems for distric power networks

  • Issued on:2002-01-01
  • Implemented on:2003-06-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $320.00
$311.00

《GB/T 13730-2002地区电网调度自动化系统》由TC82(全国电力系统管理及其信息交换标准化技术委员会)归口,主管部门为中国电力企业联合会。
本标准规定了地区电网调度自动化系统的技术要求、测试方法和检验规则。本标准适用于地区级电网的调度自动化系统。企业供电网及其他供电网的调度自动化系统、变电站集中控制系统亦可参照使用。


1 Scope

This standard specifies the technical requirements, test methods and inspection rules with regards to the dispatching automation system for district power networks.
This standard is applicable to the dispatching automation system for district power networks and used as a reference to the enterprise dispatch automation system of power supply network and other power supply networks and the centralized control system in the transformer substation.

2 Normative References

The following normative documents contain provisions which, through reference in this standard document. For dated reference, subsequent amendments to (excluding corrections to), or revisions of, any of these publications do not apply. However, all parties coming to an agreement according to this standard are encouraged to study whether the latest editions of these documents are applicable. For undated references, the latest edition of the normative document referred to applies.
GB/T 3873 "General Specifications for Products Packaging of Communication Equipments"
GB/T 9813 "Generic Specification for Microcomputer"
GB/T 13729 "Remote Terminal Unit Equipment"
GBJ 50174 "Design Code for Electronic Computer Room"
DL/T 630 "Technical Requirement for RTU with A. C. Electrical Quantities Input Discrete Sampling"
IEC 60870-5 (all parts) "Telecontrol Equipment and Systems - Part 5: Transmission Protocol
IEC 60870-6 (all parts) "Telecontrol Protocol Compatible with ISO Standards and ITU-T Recommendations - TASE 2 Object Models"
IEC 61850 (all parts) "Communication Networks and Systems in Substations"

3 General Requirements

3.1 Working conditions and ambient conditions
3.1.1 Working conditions at master station
The computer at the master station (dispatching end) shall work normally at the conditions below:

Foreword I
1 Scope
2 Normative References
3 General Requirements
4 Function of Supervisory Control and Data Acquisition (SCADA)1)
5 Real-time Network Analysis Function
6 Functions of dispatcher training simulator (DTS)
7 Test Method
8 Inspection Rules
9 Marking, Packing, Transport and Storage
Appendix A (Informative) Supervisory Control and Data Acquisition Function Test
Appendix B (Informative) Real-time Network Analysis Function Test
Appendix C (Normative) Standard Network Model for Testing the Real-time Network Analysis Function
Appendix D (Normative) Scope and Directions of Data Acquisition for Real-time Network Analysis
Appendix E (Informative) Test of Dispatcher Training Simulator

Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • GB/T 25320.11-2023 in English

    GB/T 25320.11-2023 in English

    Power systems management and associated information exchange—Data and communications security—Part 11:Security for XML documents

    2023-12-28
  • GB/T 44773-2024 in English

    GB/T 44773-2024 in English

    Technical specifications for remote automatic power control (ADC) of high voltage direct current converter station

    2024-10-26
  • GB/Z 25320.1001-2023 in English

    GB/Z 25320.1001-2023 in English

    Power systems management and associated information exchange— Data and communication security—Part 100-1 : Conformance test cases for IEC 62351-5 and IEC TS 60870-5-7

    2023-12-28
  • GB/T 31460-2015 in English

    GB/T 31460-2015 in English

    Technical guide for reactive power compensation and allocation of HVDC converter stations

    2015-05-15
  • GB/T 37546-2019 in English

    GB/T 37546-2019 in English

    Technical specification for unattended substation monitoring and control system

    2019-06-04