Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
subsea production systems part riser system design systems scopethis part natural gas industries design — surface wireline operation system appraisal inspection table four-gear morse taper shank end-milling cutter d=14~50mm space scopethis standard applies
GB/T 21412.7-2018 in English

GB/T 21412.7-2018 in English

VALID

Petroleum and natural gas industries—Design and operation of subsea production systems—Part 7:Completion/workover riser systems

  • Issued on:2018-03-15
  • Implemented on:2018-10-01
  • File Format:PDF
  • Delivery:Via email within 10 business days
Price(USD): $2,710.00
$2,629.00
Standard No: GB/T 21412.7-2018
Document status: VALID
Title in English: Petroleum and natural gas industries—Design and operation of subsea production systems—Part 7:Completion/workover riser systems
Title in Chinese: 石油天然气工业 水下生产系统的设计与操作 第7部分:完井或修井隔水管系统
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 10 business days
Issued on: 2018-03-15
Implemented on: 2018-10-01
ICS Classification: 75.180.10-Exploratory and extraction equipment
Chinese Classification: E94-Offshore petroleum operation equipment
Professional Classification: GB-National Standard
Related Keywords: subsea production systems part
riser system design
systems scopethis part
natural gas industries design
— surface wireline operation system
Related Topics: Water pipe standard
water pipe
tube system
Waterproof
industrial operation well
GB/T 21412.7
GB/T 21412.7-2018
Well workover riser
Production casing for natural gas wells

《GB/T 21412.7-2018石油天然气工业 水下生产系统的设计与操作 第7部分:完井或修井隔水管系统》由TC355(全国石油天然气标准化技术委员会)归口,主管部门为国家标准化管理委员会。


Scope

This part of GB/T 21412 specifies the requirements for the riser system design, man analysis, material, manufacture, test and installation from the floating unit; Installation and testing tools; —— Xmas tree cap and man tools. Relevant equipment not included in this part is as follows: ——— Tubing hanger; —— Xmas tree inner and outer caps; ——— Tubing hanger lowering tool; ———Surface coiled tubing system; ———Surface Wireline operation system; ———ground test tree kill well and production jumper pipe.

Sample only — not a preview of GB/T 21412.7-2018
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend