《GB/T 28548-2012核电厂主回路水压试验技术导则》由524(中国电力企业联合会)归口,主管部门为中国电力企业联合会。
Scope
This standard specifies the hydraulic test method, technical requirements and acceptance criteria for the main circuit of a PWR nuclear power plant to confirm that the integrity of the pressure boundary of the main circuit and the quality of equipment manufacturing and installation meet the requirements for long-term stable operation of the unit and nuclear safety specifications. This standard is applicable to the hydraulic test of the main circuit in the initial commissioning stage of the pressurized water reactor nuclear power plant.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 28550-2012 in English
Piping verification requirement during nuclear power plant commissioning
2012-06-29 -

GB/T 28549-2012 in English
Verification requirement of supports in nuclear island during nuclear power plant commissioning
2012-06-29