Pressurized water reactor nuclear power plant primary circuit hydraulic pressure test
Pressurized water reactor nuclear power plant primary circuit hydraulic pressure test, Total:93 items.
The international standard classification for "Pressurized water reactor nuclear power plant primary circuit hydraulic pressure test" includes: Other standards related to nuclear energy , Nuclear power plants. Safety , Radiation measurements .
The Chinese standard classification for "Pressurized water reactor nuclear power plant primary circuit hydraulic pressure test" includes: Electric power testing technique , Power reactor , Radiation protection detection and evaluation , Nuclear reactor and nuclear island equipment of nuclear power plant .
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
- GB/T 28548-2012 Guideline of nuclear power plant primary circuit hydraulic tests
- GB/T 41587-2022 Requirements for cold performance test before initial fuel loading of pressurized water reactor nuclear power plants
- GB/T 41584-2022 Requirements for hot performance test before initial fuel loading of pressurized water reactor nuclear power plants
- GB/T 41576-2022 Requirements for unit performance test after initial fuel loading of pressurized water reactor nuclear power plants
- GB/T 28548-2012(英文版) Guideline of nuclear power plant primary circuit hydraulic tests
- GB/T 41591-2022 Initial criticality tests for pressurized water reactor of nuclear power plants
- GB/T 42142-2022 Analysis criterion for radiation source term in auxiliary and secondary coolant system of pressurized water reactor nuclear power plant
- GB/T 17569-1998 Classification for the Items of Pressurized Water Reactor Nuclear Power Plants
- GB/T 17569-2013e Classification for the items of pressurized water reactor nuclear power plants
- GB/T 17569-2021 Classification for the items of pressurized water reactor nuclear power plants
Professional Standard - Energy and Power Planning
- DL/T 1143-2009 Supervision guide for PWR nuclear power plant primary loop components
Group Standards of the People's Republic of China
- T/CNEA 002-2021 Guidelines for zinc addition in primary coolant of PWR
- T/CNS 66-2022 Guideline for pneumatic test in primary loop of high temperature gas-cooled reactor nuclear power plants
Professional Standard - Energy
- NB/T 20091-2012 Inspection Guide for the Turbine of Pressurized Water Reactor Nuclear Power Plants
- NB 20480-2018 Technical requirements for flushing of nuclear circuits in pressurized water reactor nuclear power plants
- NB/T 20435-2017 Physics tests for pressurized water reactor of nuclear power plants commissioning startup
- NB 20509-2018 Pressurized Water Reactor Nuclear Power Plant Unit Load Disturbance Test
- NB/T 20142-2012 Guide for Chemical Decontamination of Primary Loop System and Components of PWR Nuclear Power Plants
- NB/T 20144-2012 Initial Criticality Tests for Pressurized Water Reactor of Nuclear Power Plants
- NB 20484-2018 Thermal balance test of nuclear steam supply system of pressurized water reactor nuclear power plant
- NB/T 20586-2021 Technical guideline of hydrostatic testing for nuclear pressure vessels in pressurized water reactor plants
- NB/T 20168-2012 Qualification Procedure for Check Valve of Pressurized Water Reactor Nuclear Power Plants
- NB/T 20657-2023 Technical requirements for core power distribution measurement test of pressurized water reactor nuclear power plants
- NB/T 20469-2023 Technical Guidelines for Testing of Pressurized Water Reactor Nuclear Power Plants Loss of Off-site Power Supply
- NB/T 20434-2017RK PWR Nuclear Power Plant Reactor's First Fuel Loading Test
- NB/T 20441-2017 Technical regulation of hydrostatic test for secondary part of the steam generator of pressurized water reactor nuclear power plants
- NB/T 20221-2013 Corrosion Examination for Secondary Circuit Thermal Power Equipment of PWR Nuclear Power Plants
- NB/T 25038-2014 Circulating water system commissioning program rule of PWR
- NB/T 20435-2017RK PWR Nuclear Power Plant Reactor Commissioning Start-up Core Physical Test
- NB/T 20584-2021 Technical guideline for secondary circuit vacuum tightness test of PWR nuclear power plants
- NB/T 20509-2018 Unit load swing test for pressurized water reactor nuclear power plant
- NB/T 20484-2018 Nuclear steam supply system heat balance test of pressurized water reactor nuclear power plant
- NB/T 20017-2010 Structural Integrity Test of Containments for Pressurized Water Reactor Power Plants
- NB/T 25098-2018 Guideline for chemical supervision of water and steam in the secondary circuit of PWR
- NB/T 20018-2021 Containment tightness test of pressurized water reactor nuclear power plant
- NB/T 20469-2017 Technical Guideline for loss offsite power test of PWR nuclear power plant
- NB/T 20613-2021 Technical guidelines for commissioning chilled water system of PWR nuclear power plant
- NB/T 20280-2014 Design criteria of boron recycle system for PWR nuclear power plants
- NB/T 20434-2017 Initial loading test for pressurized water reactor of nuclear power plant
- NB/T 20436-2017 Water chemistry for pressurized water reactor nuclear power plant
- NB/T 20334-2015 General requirements for noise analysis of reactor and primary loop in pressurized water reactor nuclear power plant
- NB/T 25102-2019 Condenser performance test guideline for pressurized water reactor nuclear power plant
- NB/T 20583-2021 Technical guideline for loss of control power test of PWR nuclear power plants
- NB/T 25037-2014 Feedwater system commissioning program rule of PWR
- NB/T 20035-2011 Categorization of Conditions of PWR Nuclear Power Plants
- NB/T 20480-2018 Technical requirement for flushing of primary system in PWR nuclear power plants
- NB/T 20333-2015 Design criteria of safety depressurization and venting system for primary loop of pressurized water reactor nuclear power plant
- NB/T 20064-2012 Installation and Test Requirement of In-core Instrumentation System in Pressured Water Reactor Nuclear Power Plant
- NB/T 20100-2012 Principles for Main Primary System and Main Steam System Overpressure Analysis of Pressurized Water Reactor Nuclear Power Plants
- NB/T 20092-2012 Inspection Guide for the Moisture Separator Reheater of Pressurized Water Reactor Nuclear Power Plants
- NB/T 20316-2014 Requirements for hot functional tests before core loading for PWR nuclear power plants
- NB/T 20712-2023 Guidelines for zinc addition to primary coolant in pressurized water reactor nuclear power plants
- NB/T 25116-2020 Directive of turbine steam admission and no-load operation test for pressurized water reactor nuclear power plants
- NB/T 20574-2019 Terminology of commissioning for PWR nuclear power plants
- NB/T 20662-2023 Classification of operating conditions of pressurized water reactor nuclear power plants
- NB/T 20468-2017 Load rejection test guideline for pressurized water reactor of nuclear power plant
Professional Standard - Nuclear Industry
- EJ/T 397-1989 300 MW PWR Nuclear Power Plant Primary Circuit Auxiliary System Filter Element Manufacture and Acceptance Technical Conditions
- EJ/T 393-1989 300MW Pressurized Water Reactor Nuclear Power Plant Safety Four-Pipe Installation Technical Conditions for the Primary Circuit System
- EJ/T 345-2005 The control of water chemistry for pressurized water reactor nuclear power plant
- EJ/T 319-1992 Thermal-hydraulic Design Criteria for Pressurized Water Reactor Nuclear Power Plant
- EJ/T 405-1989 General technical specifications for primary circuit stainless steel valves of 300 MW pressurized water reactor nuclear power plant
- EJ/T 406-1999 Specification for primary system stainless steel elbow bent with intermediate frequency heating procedure for pressurized water reactor nuclear power plants
- EJ/T 747-1992 Guidelines for chemical decontamination of primary circuit systems and equipment in pressurized water reactor nuclear power plants
- EJ 401-1989 Stainless steel seamless steel pipe series for the primary circuit auxiliary system of the 300,000-kilowatt pressurized water reactor nuclear power plant
- EJ 322-1988 Design criteria for reactor pressure vessels in pressurized water reactor nuclear power plants
- EJ 345-1988 Water chemistry specification for pressurized water reactor nuclear power plant
- EJ/T 635-1992 Design criteria for boron recovery system in pressurized water reactor nuclear power plant
- EJ/T 1022.15-1996 PWR nuclear power plant valve-Part 15: Seismic identification test
- EJ/T 1115-2000 Physics tests at low power for PWR nuclear power plant
- EJ 310-1988 PWR Nuclear Power Plant Engineering Terminology
- EJ/T 404-1999 Specification for primary system seamless stainless steel butt-welding fittings for pressurized water reactor nuclear power plants
- EJ/T 423-1989 Technical conditions for the acceptance of butyl cloth plastic bags for water surface covering of primary circuit water storage vessels of 300,000-kilowatt pressurized water reactor nuclear power plants
- EJ/T 810-1994 One-time start-up of neutron source rods in pressurized water reactor nuclear power plants
- EJ/T 400-1989 Technical conditions for piping installation of the secondary circuit system of the reactor building of the 300,000-kilowatt pressurized water reactor nuclear power plant
- EJ/T 387-1989 Cleaning Technical Conditions for the Commissioning Phase of the Primary Circuit System of 300MW PWR Nuclear Power Plant
- EJ/T 1113-2000 Initial critical test in PWR nuclear power plant
- EJ 341-1988 Water supply requirements for nuclear steam supply system of pressurized water reactor nuclear power plant
- EJ/T 480-1989 Construction Design Regulations for Primary Circuit System of 300MW Pressurized Water Reactor Nuclear Power Plant
- EJ 406-1989 Technical specifications for stainless steel intermediate frequency elbows in the primary circuit system of 300,000-kilowatt pressurized water reactor nuclear power plants
- EJ/T 1098-1999 Structural integrity test of containments for pressurised water reactor power plants
- EJ/T 1114-2000 Initial loading test for PWR nuclear power plant
- EJ/T 394-1989 Technical conditions for the manufacture and acceptance of piping supports and hangers for the primary circuit system of a 300,000-kilowatt pressurized water reactor nuclear power plant
- EJ/T 446-1989 300MW PWR nuclear power plant reactor physical start-up test
- EJ/T 318-1992 Reactor Design Criteria for Pressurized Water Reactor Nuclear Power Plants
- EJ/T 1022.9-1996 Ex-factory inspection and test of valve products in pressurized water reactor nuclear power plant
- EJ/T 589-1999 Containment leaktightness test for pressurized water reactor of nuclear power plant
German Institute for Standardization
- DIN IEC 62117:2001-10*VDE 0491-4:2001-10 Nuclear power plants - Pressurized light water reactors
American Nuclear Society (ANS)
- ANS 51.1-1983(R1988) Nuclear Safety Criteria for the Design of Stationary Pressurized Water Reactor Plants
GCC Standardization Organization
- GSO IEC 61502:2014 Nuclear power plants - Pressurized water reactors - Vibration monitoring of internal structures
IT-UNI
- UNI ISO 20890-3:2020 Guidelines for in-service inspections for primary coolant circuit components of light water reactors - Part 3: Hydrostatic testing
British Standards Institution (BSI)
- BS ISO 20890-3:2020 Guidelines for in-service inspections for primary coolant circuit components of light water reactors - Hydrostatic testing
Gosstandart of Russia
- GOST 24722-1981 Nuclear power vessel-encapsulated, pressurized-water reactor. General requirements
Canadian Standards Association (CSA)
- CSA N285.5-2022 Periodic inspection of CANDU nuclear power plant containment components