Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
reactor core instrumentation system equipment core instrumentation system installation plans pressured water reactor nuclear power plant scopethis standard equipment installation reactor core instrument system tailings pond safety roof panels electronic weighing instruments gb/t
NB/T 20064-2012 in English

NB/T 20064-2012 in English

VALID

Installation and Test Requirement of In-core Instrumentation System in Pressured Water Reactor Nuclear Power Plant

  • Issued on:2012-01-06
  • Implemented on:2012-04-06
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $150.00
$146.00
Standard No: NB/T 20064-2012
Document status: VALID
Title in English: Installation and Test Requirement of In-core Instrumentation System in Pressured Water Reactor Nuclear Power Plant
Title in Chinese: 压水堆核电厂反应堆堆芯仪表系统安装和试验要求
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2012-01-06
Implemented on: 2012-04-06
Professional Classification: NB-Energy
Related Keywords: reactor core instrumentation system equipment
core instrumentation system installation plans
pressured water reactor nuclear power plant scopethis standard
equipment installation
reactor core instrument system
Related Topics: reactor
PWR
reactor core
Nuclear Reactor Core Detector
nb/t 20186-2012
Core
NB/T+20186-2012
Core instrumentation
nb/t20039.3-2012
Instrument system
nb/t20119-2012
Mechanical module installation of pressurized water reactor nuclear power plant
PWR nuclear power plant loose parts and
Nuclear power plant core measuring instruments
nb/t 20192-2012
Technical specification for installation of rod power system in pressurized water reactor nuclear power plant
neutron flux pressurized water reactor
Bulk Density Tester
nb/t 20039.3-2012
nb/t20039.8-2012
reactor target system
small nuclear reactor
Yidui
Rituals
new nuclear reactor
nb/t20133.6-2012
nb/t 20182-2012
heap
Thermopile series
Potential Response Test
nuclear reactor computer
Reaction Test System
nb/t 20136-2012
nb/t 20193-2012
Cadmium in Nuclear Reactors
nuclear reactor computer
Instrument system
Pressurized water reactor nuclear power plant
NB/T31022-2012
Pressurized water reactor nuclear power plant primary circuit hydraulic pressure test
Edible oil stacking requirements
micro fission chamber
Pressurized water reactor nuclear power plant standard system project list
nb/t20193-2012
nb/t47025-2012
nb/t47021-2012
nb/t 20139-2012
Pressurized Water Reactor Standard
nb/t 20123-2012
nb/t 20185-2012
nb/t 20194-2012
nb/t47023-2012
nb/t 47022-2012
nb/t47024-2012
Water content meter installation
nb/t20125-2012
nb/t 47027-2012
nb/t10558-2012
nb/t47022-2012
nb/t 20247-2012
nb/t20096-2012
nb/t 47021-2012


Scope

This standard specifies the installation, inspection and testing requirements for reactor core instrumentation systems in pressurized water reactor nuclear power plants, mainly including core instrumentation system installation plans, preparation of installation and testing related documents, installation and testing personnel qualifications, pre-installation inspections, and installation process inspections. and test requirements after installation, etc. to ensure that the installation and testing of the reactor core instrument system meet the functional and performance requirements specified by the system. This standard applies to the installation and testing of reactor core instrumentation system equipment in pressurized water reactor nuclear power plants. This standard does not put forward specific requirements for the following activities during equipment installation: a) Welding, non-destructive inspection, physical and chemical testing of welded parts; b) Purge of instrument pipelines; c) Alignment and adjustment of rotating equipment; d) Verification of the integrity of the equipment support structure; e) Regular testing and maintenance after the equipment is put into operation; f) Receiving inspection and testing after the equipment is completed.

Sample only — not a preview of NB/T 20064-2012
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend