Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)

reactor target system

reactor target system, Total:264 items.

The international standard classification for "reactor target system" includes: Reactor engineering , Nuclear power plants. Safety , Nuclear energy engineering .

The Chinese standard classification for "reactor target system" includes: Nuclear reactor and nuclear island equipment of nuclear power plant , Nuclear instrument for reactor , Medical nuclear instrument , Nuclear island of nuclear power plant , Power reactor , General nuclear instrument .


Group Standards of the People's Republic of China

  • T/TLRIA 0005-2018 Rubber gaskets for ventilation systems in nuclear reactor pits
  • T/CNS 39-2020 Design criteria for the reactor protection system of high temperature gas-cooled reactor nuclear power plant
  • T/CNS 30-2020 Design criteria for the reactor coolant systems of high temperature gas cooled reactor nuclear power plant

Professional Standard - Energy

  • NB/T 20285-2014 General requirements of reactor system design for pressurized water reactor nuclear power plants
  • NB/T 20057.3-2023 Pressurized Water Reactor Nuclear Power Plant Reactor System Design Reactor Core Part 3: Fuel Assemblies
  • NB/T 20304-2014 Technical guideline for installation of reactor protection system of pressured water reactor nuclear power plants
  • NB/T 20254-2013 Code for the Leakage Detection of Reactor Coolant System in Nuclear Power Plants
  • NB/T 20102-2012 Determination of Steady State Neutron Reaction Rate Distributions and Reactivity of Nuclear Reactors
  • NB/Z 20254-2013 Guidelines for Leak Detection of Reactor Coolant Systems in Nuclear Power Plants
  • NB/T 20057.1-2012 Pressurized Water Reactor Nuclear Power Plants Reactor System Design - Core - Part 1: Nuclear Design
  • NB/T 20343-2021 Design and fabrication specification for the thermal insulation of reactor vessel and reactor cool an tpipings and equipments of PWR nuclear power plants
  • NB/T 20057.3-2012 PWR Nuclear Power Plants Reactor System Design - Core - Part 3: Fuel Assembly
  • NB/T 20100-2012 Principles for Main Primary System and Main Steam System Overpressure Analysis of Pressurized Water Reactor Nuclear Power Plants
  • NB/T 20057.2-2012 Pressurized Water Reactor Nuclear Power Plants Reactor System Design - Core- Part 2: Thermal Hydraulic Design Criteria
  • NB/T 20467-2017 Commissioning technical guideline for reactor protection system of PWR nuclear power plant
  • NB/T 20688-2023 Transient analysis requirements for reactor coolant system design in pressurized water reactor nuclear power plants
  • NB/T 20556-2019 Calculation method of reactor core excess reactivity for heavy water reactor
  • NB/T 20064-2012 Installation and Test Requirement of In-core Instrumentation System in Pressured Water Reactor Nuclear Power Plant
  • NB/T 20434-2017RK PWR Nuclear Power Plant Reactor's First Fuel Loading Test
  • NB/T 20100-2016 Requirements of overpressure analysis for reactor coolant system and main steam system for pressurized water reactor unclear power plants
  • NB/T 20100-2016RK Requirements of overpressure analysis for reactor coolant system and main steam system for pressurized water reactor nuclear power plants
  • NB/T 20660-2023 Technical Guidelines for Commissioning of Reactor Coolant Systems in Pressurized Water Reactor Nuclear Power Plants
  • NB/T 20435-2017 Physics tests for pressurized water reactor of nuclear power plants commissioning startup
  • NB/T 20435-2017RK PWR Nuclear Power Plant Reactor Commissioning Start-up Core Physical Test
  • NB/T 20343-2015 Design and fabrication specification for the thermal insulation of reactor vessel and reactor coolant pipings and equipments of PWR nuclear power plants
  • NB/T 20187-2012 Design Criteria for Reactor Coolant System in Pressurized Water Reactor Nuclear Power Plants
  • NB/T 20057.4-2012 PWR Nuclear Power Plants Reactor System Design - Core - Part 4: Core Components
  • NB/T 20434-2017 Initial loading test for pressurized water reactor of nuclear power plant
  • NB/T 20582-2021 Commissioning technical guideline for reactor boron and water makeup system of PWR nuclear power plants
  • NB/T 20144-2012 Initial Criticality Tests for Pressurized Water Reactor of Nuclear Power Plants

General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

  • GB/T 12789.2-1991 Criteria for nuclear reactor instrumentation Part 2:pressurized water reactors
  • GB/T 4083-1983 General safety principles of nuclear reactor protection system
  • GB/T 8995-1988 In-core instrumentation for neutron fluence rate measurements in nuclear reactors
  • GB/T 13628-1992 Nuclear reactor use of the protection system for non-safety purpose
  • GB/T 45569-2025 Design criteria for the thermal insulation of reactor coolant system main equipments and piping of PWR nuclear power plants
  • GB/T 5963-1995 Separation criteria for reactor protection system
  • GB/T 4083-2005 General safety principles of unclear reactor protection system
  • GB 12789.2-1991 Nuclear Reactor Instrumentation Guidelines Part II: Pressurized Water Reactors
  • GB/T 8995-2008 In-core instrumentation for neutron fluence rate measurements in nuclear reactors
  • GB/T 12789.3-1992 Criteria for nuclear reactor reactor instrumentation Part three. High temperature gas-cooled reactor(HTGR)
  • GB 12789.3-1992 Nuclear Reactor Instrumentation Guidelines Part III: High Temperature Gas Cooled Reactors
  • GB/T 12789.3-2025 Criteria for nuclear reactor instrumentation—Part 3:High temperature gas-cooled reactor
  • GB/T 12789.2-2025 Criteria for nuclear reactor instrumentation—Part 2: Pressurized water reactors
  • GB/T 41591-2022 Initial criticality tests for pressurized water reactor of nuclear power plants

Professional Standard - Nuclear Industry

  • EJ/T 1114-2000 Initial loading test for PWR nuclear power plant
  • EJ/T 449-1989 300MW PWR Nuclear Power Plant Reactor Main System Equipment and Installation Guidelines for Its Supports
  • EJ/T 675-1992 Fission ionization chamber for reactor
  • EJ/T 20130-2016 Design criteria for ship reactor containment and systems
  • EJ/T 325-1988 Design criteria for reactor coolant system in pressurized water reactor nuclear power plant
  • EJ/T 720-2008 Design criterion for the thermal insulation of reactor vessel and reactor coolant pipings and equipments of PWR nuclear power plants
  • EJ/T 720-1992 Design criteria for the insulation layer of reactor pressure vessels and reactor coolant system piping and equipment in pressurized water reactor nuclear power plants
  • EJ/T 20206-2018 Sodium Cooled Fast Breeder Reactor Design Criteria Reactor Overpressure Protection System
  • EJ 326-1988 Design criteria for reactor coolant auxiliary systems in pressurized water reactor nuclear power plants
  • EJ/T 383-1989 Transient regulations for design of reactor coolant system in 300 MW pressurized water reactor nuclear power plant
  • EJ/T 1115-2000 Physics tests at low power for PWR nuclear power plant
  • EJ/T 320-1998 General design criteria of reactor for pressurized water reactor nuclear power plants
  • EJ/T 1113-2000 Initial critical test in PWR nuclear power plant
  • EJ/T 1014-2005 Determination of steady state neutron reaction rate distributions and reactivity of nuclear reactors
  • EJ/T 836-1994 Pulse Reactor Commissioning Program
  • EJ/T 318-1992 Reactor Design Criteria for Pressurized Water Reactor Nuclear Power Plants
  • EJ/T 853-1994 Design and application of microreactor beryllium reflector
  • EJ/T 567-1991 Nuclear Reactor Instrumentation Terminology
  • EJ 622-1992 Reactor Fuel Element Terminology
  • EJ/T 493-1989 300MW PWR Nuclear Power Plant Reactor Core Neutron Flux Measurement System Piping Design Regulations
  • EJ/T 400-1989 Technical conditions for piping installation of the secondary circuit system of the reactor building of the 300,000-kilowatt pressurized water reactor nuclear power plant
  • EJ/T 668-1992 Design criteria for reactor coolant pressure boundary leak detection system for pressurized water reactor nuclear power plants
  • EJ 334-1988 Design criteria for main equipment supports of reactor coolant system in pressurized water reactor nuclear power plant
  • EJ/T 20050-2014 Criteria for the design and operation of ventilation systems for nuclear installations other than nuclear reactors

Professional Standard - Navy

  • HJB 220-2000 Test target for antiship missile weapon system

Military Standard of the People's Republic of China-General Armament Department

  • GJB 3550-1999 Specification for submarine reactor coolant systems and equipment insulation
  • GJB 6269-2008 Specification for the target of anti-ship missile weapon system
  • GJB 820A-2018 Specification for coatings for submarine reactor compartments
  • GJB 2984-1997 Specification for vertical target acoustic target system for gun use

Professional Standard - Energy and Power Planning

  • DL/T 1142-2009 Suftwarae test for reactur cuntrul systemof nuelear popear power plants

Professional Standard - Machinery

American Nuclear Society (ANS)

  • 15.15-1978 Criteria for the Reactor Safety Systems of Research Reactors
  • ANS 15.15-1978(R1986) Criteria for the Reactor Safety Systems of Research Reactors
  • ANS 56.6-1978 Pressurized Water Reactor Containment Ventilation Systems
  • 51.10-1979 AUXILIARY FEEDWATER SYSTEM FOR PRESSURIZED WATER REACTORS
  • 56.6-1986 Pressurized Water Reactor Containment Ventilation Systems
  • 56.6-1978 PRESSURIZED WATER REACTOR CONTAINMENT VENTILATION SYSTEMS
  • ANS 56.6-1986 Pressurized Water Reactor Containment Ventilation Systems
  • ANS 56.7-1978(R1987) Boiling Water Reactor Containment Ventilation Systems
  • 56.7-1978 Boiling Water Reactor Containment Ventilation Systems
  • ANS 51.10-1991 Auxiliary feedwater system for pressurized water reactors
  • ANS 59.1-1986 Cooling Water Systems for Light Water Reactors, Nuclear Safety Related
  • ANS 59.1-1979 Nuclear Safety Related Cooling Water Systems for Light Water Reactors
  • ANS 55.6-1979 Liquid Radioactive Waste Processing System for Light Water Reactor Plants
  • 57.1-1980 DESIGN REQUIREMENTS FOR LIGHT WATER REACTOR FUEL HANDLING SYSTEMS
  • ANS 57.1-1992(R2024) Design Requirements for Light Water Reactor Fuel Handling Systems
  • 57.1-1992 Design Requirements for Light Water Reactor Fuel Handling Systems
  • ANS 57.1-1992 Design Requirements for Light Water Reactor Fuel Handling Systems
  • ANS 55.1-2021 Solid Radioactive Waste Processing System for Light-Water-Cooled Reactor Plants
  • 58.6-1996 Criteria for Remote Shutdown for Light Water Reactors
  • 19.3-1983 DETERMINATION OF NEUTRON REACTION RATE DISTRIBUTIONS AND REACTIVITY OF NUCLEAR REACTORS
  • ANS 55.1-1979 Solid Radioactive Waste Processing System for Light-Water-Cooled Reactor Plants
  • ANS 15.16-2015(R2024) Emergency Planning for Research Reactors
  • ANS 55.4-1993 Gaseous Radioactive Waste Processing Systems for Light Water Reactor Plants
  • ANS 19.3-2005 Determination of Neutron Reaction Rate Distributions and Reactivity of Nuclear Reactors
  • 58.6-1983 CRITERIA FOR REMOTE SHUTDOWN FOR LIGHT WATER REACTORS
  • 19.3-1995 Determination of Steady State Neutron Reaction Rate Distributions and Reactivity of Nuclear Reactors
  • ANS 19.3-1995 Determination of Steady State Neutron Reaction Rate Distributions and Reactivity of Nuclear Reactors
  • ANS 55.4-1979 Gaseous Radioactive Waste Processing Systems for Light Water Reactor Plants
  • ANS 55.6-1993 Liquid Radioactive Waste Processing System for Light Water Reactor Plants
  • 14.1-1975 Operation of Fast Pulse Reactors
  • ANS 15.16-2008 Emergency planning for research reactors
  • 19.3-2005 Determination of Steady-State Neutron Reaction-Rate Distributions and Reactivity of Nuclear Power Reactors
  • ANS 58.9-1981(R2020) Single Failure Criteria for Light Water Reactor Safety-Related Fluid Systems
  • 55.4-1993 Gaseous Radioactive Waste Processing Systems for Light Water Reactor Plants
  • 55.6-1993 Liquid Radioactive Waste Processing System for Light Water Reactor Plants
  • 58.9-2002 Single failure criteria for light water reactor safety-related fluid systems
  • 14.1-2004 Operation of Fast Pulse Reactors
  • ANS 14.1-2004(R2019) Operation of Fast Pulse Reactors
  • ANS 14.1-2004(R2024) Operation of Fast Pulse Reactors
  • ANS 55.6-1993(R2007) Liquid Radioactive Waste Processing System for Light Water Reactor Plants
  • ANS 55.1-1992(R2017) Solid Radioactive Waste Processing System for Light-Water-Cooled Reactor Plants
  • ANS 58.11-1983(W1995) Cooldown Criteria for Light Water Reactors
  • ANS 55.4-1993(R1999) Gaseous Radioactive Waste Processing Systems for Light Water Reactor Plants
  • ANS 19.3-1983 Determination of Steady-State Neutron Reaction-Rate Distributions and Reactivity of Nuclear Power Reactors
  • 55.4-1979 GASEOUS RADIOACTIVE WASTE PROCESSING SYSTEMS FOR LIGHT WATER REACTOR PLANTS
  • ANS 56.3-1977(R1987) Overpressure Protection of Low Pressure Systems Connected to the Reactor Coolant Pressure
  • 55.6-1979 LIQUID RADIOACTIVE WASTE PROCESSING SYSTEM FOR LIGHT WATER REACTOR PLANTS
  • ANS 14.1-1975 Operation of Fast Pulse Reactors R(2000)
  • ANS 14.1-1975(R2000) Operation of Fast Pulse Reactors
  • ANS 14.1-2004 Operation of Fast Pulse Reactors
  • 58.11-1983 COOLDOWN CRITERIA FOR LIGHT WATER REACTORS
  • ANS 19.11-1997 Calculation and Measurement of the Moderator Temperature Coefficient of Reactivity for Water Moderated Power Reactors

Canadian General Standards Board (CGSB)

Canadian Standards Association (CSA)

American National Standards Institute (ANSI)

Türk Standardları Enstitüsü

Swedish Institute for Standards

  • SIS SS IEC 639:1981 Nuclear instrumentation - Nuclear reactors - Use of the protection system for non-safety purposes
  • SIS SS IEC 671:1983 Nuclear instrumentation - Protection system of nuclear reactors - Period/c tests and monitoring

Czech Standards Institute (UNMZ)

Bureau of Indian Standards

International Electrotechnical Commission (IEC)

  • IEC 60709:1981 Separation within the reactor protection systems
  • IEC 60289:1968 Reactors
  • IEC 61343:1996 Nuclear reactor instrumentation - Boiling light water reactors (BWR) - Measurements in the reactor vessel for monitoring adequate cooling within the core
  • IEC 61505:1998 Nuclear reactor instrumentation - Boiling water reactors (BWR) - Stability monitoring
  • IEC 60639:1979 Nuclear reactors. Use of the protection system for non-safety purposes
  • IEC 60671:1980 Periodic tests and monitoring of the protection system of nuclear reactors
  • IEC 60911:2025 PRV Nuclear power plants - Instrumentation systems - Measurements for monitoring adequate cooling within the core of pressurized light water reactors
  • IEC 62117:1999 Nuclear Reactor Instrumentation - Pressurized Light Water Reactors (PWR) - Monitoring Adequate Cooling within the Core During Cold Shutdown (Edition 1.0)
  • IEC 60231D:1975 General principles of nuclear reactor instrumentation
  • IEC 63374:2025 PRV Nuclear power plants – Instrumentation systems important to safety – Characteristics and test methods of nuclear reactor reactivity meters
  • IEC 62118:2000 Nuclear reactor instrumentation - Pressurized water reactor (PWR) of VVER design - Monitoring adequate cooling within the core during shutdown
  • IEC 60231G:1977 General principles of nuclear reactor instrumentation. Seventh supplement: Liquid-metal cooled fast reactor
  • IEC 61250:1994 Nuclear reactors; instrumentation and control systems important for safety; detection of leakage in coolant systems
  • IEC 60231C:1974 General principles of nuclear reactor instrumentation
  • IEC 60231B:1972 General principles of nuclear reactor instrumentation
  • IEC 60231:1967 General principles of nuclear reactor instrumentation
  • IEC 60231F:1977 General principles of nuclear reactor instrumentation. Sixth supplement: Heavy-water-moderated reactor with steam generating direct-cycle turbine
  • IEC 60557:1982 I E C terminology in the nuclear reactor field

Korean Agency for Technology and Standards (KATS)

British Standards Institution (BSI)

  • BS EN 60289:1995 Reactors
  • BS EN 60289:1994 Reactors
  • BS IEC 61505:1998 Nuclear reactor instrumentation. Boiling water reactors (BWR). Stability monitoring
  • BS ISO 4233:2023 Reactor technology. Nuclear fusion reactors. Hot helium leak testing method for high temperature pressure-bearing components in nuclear fusion reactors
  • 25/30475278 DC BS ISO 18075 Reactor technology - Power reactor analysis - Steady-state neutronics methods
  • BS IEC 62117:2000 Nuclear reactor instrumentation - Pressurized light water reactors (PWR) - Monitoring adequate cooling within the core during cold shutdown
  • BS IEC 62117:1999 Nuclear reactor instrumentation. Pressurized light water reactors (PWR). Monitoring adequate cooling within the core during cold shutdown.
  • BS ISO 23466:2020 Design criteria for the thermal insulation of reactor coolant system main equipments and piping of PWR nuclear power plants
  • 23/30469793 DC BS IEC 60911. Nuclear Power Plants. Instrumentation systems. Measurements for monitoring adequate cooling within the core of pressurized light water reactors

Spanish Association for Standardization (UNE)

European Committee for Electrotechnical Standardization(CENELEC)

International Atomic Energy Agency

  • NS-G-1.10-2004 Design of Reactor Containment Systems for Nuclear Power Plants
  • NS-G-1.9-2004 Design of the Reactor Coolant System and Associated Systems in Nuclear Power Plants
  • NS-G-1.12-2005 Design of the Reactor Core for Nuclear Power Plants

German Institute for Standardization

  • DIN 25434:1986 Reactor protection system and monitoring equipment of the safety system
  • DIN 25434:1986-11 Reactor protection system and monitoring equipment of the safety system
  • DIN 25473 E:1992-04 Drainage systems in nuclear power plants with light water reactors
  • DIN 25476:2023 Primary-coolant clean-up system in nuclear power plants with light water reactors
  • DIN 25442:1980 Evaluation of shutdown reactivity
  • DIN 25476 E:2022-10 Primary-coolant clean-up system in nuclear power plants with light water reactors
  • DIN 25476:1987 Primary-coolant clean-up system in nuclear power plants with light water reactors
  • DIN 25476:2012 Primary-coolant clean-up system in nuclear power plants with light water reactors
  • DIN 25476 E:2011 Draft Document - Primary-coolant clean-up system in nuclear power plants with light water reactors
  • DIN 25476:2022-10 Draft Document - Primary-coolant clean-up system in nuclear power plants with light water reactors
  • DIN 25433:1988-03 Fuel assembly identification for nuclear power reactors
  • DIN IEC 62117:2001-10*VDE 0491-4:2001-10 Nuclear power plants - Pressurized light water reactors

Ente Nazionale Italiano di Unificazione

  • UNI 7459:1975 Nuclear power plants. Power reactors. Criteria for protection systems.
  • UNI ISO 4233:2023 Reactor technology - Nuclear fusion reactors - Hot helium leak testing method for high temperature pressure-bearing components in nuclear fusion reactors
  • UNI 9785:1990 Protective coatings (paints) for light water nuclear reactor containment facilities. Determination of fire reaction.
  • UNI 7459-1975 Nuclear power plants. Power reactors. Criteria for protection systems.
  • UNI 7797:1977 Nuclear installations. Isolating, control and check valves of water reactors.

Magyar Szabványügyi Testület

The Directorate General of Specifications and Metrology (DGSM)

  • OS GSO IEC 62117:2015 Nuclear reactor instrumentation - Pressurized light water reactors (PWR) - Monitoring adequate cooling within the core during cold shutdown

GCC Standardization Organization

  • GSO IEC 62117:2015 Nuclear reactor instrumentation - Pressurized light water reactors (PWR) - Monitoring adequate cooling within the core during cold shutdown
  • GSO IEC/TR 61510:2014 RBMK nuclear reactors - Proposals for instrumentation and control improvements

Asociación Española de Normalización (AENOR)

American Society for Testing and Materials (ASTM)

Instrument Society of America (ISA)

American Society of Mechanical Engineers (ASME)

Gosstandart of Russia

Defense Logistics Agency

US Federal Contractor Registration (USFCR)

International Organization for Standardization (ISO)

  • ISO 23466:2020 Design criteria for the thermal insulation of reactor coolant system main equipments and piping of PWR nuclear power plants
  • ISO 4233:2023 Reactor technology — Nuclear fusion reactors — Hot helium leak testing method for high temperature pressure-bearing components in nuclear fusion reactors

Indonesia Standards

Polski Komitet Normalizacyjny (PKN)

  • PN J01101-1989 Nuclear technics Inspection, control and protection systems of nuclear reactor Terms and definitions

American Water Works Association (AWWA)

  • AWWA JAW6685 Journal AWWA — Nuclear Power Reactor Accidents and the Role of Water System Managers

National Standardisation Body (ASRO)