Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
short-term water absorption centralized resettlement civil aviation industry standards introduction standard revision background
GB/T 31052.4-2017 in English

GB/T 31052.4-2017 in English

VALID

Lifting appliances―Code of inspection and maintenance―Part 4:Jib cranes

  • Issued on:2017-05-12
  • Implemented on:2017-12-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $310.00
$301.00
Standard No: GB/T 31052.4-2017
Document status: VALID
Title in English: Lifting appliances―Code of inspection and maintenance―Part 4:Jib cranes
Title in Chinese: 起重机械 检查与维护规程 第4部分:臂架起重机
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2017-05-12
Implemented on: 2017-12-01
ICS Classification: 53.020.20-Cranes
Chinese Classification: J80-Hoisting machinery
Professional Classification: GB-National Standard
Related Topics: maintenance procedures
Safety Regulations for Lifting Appliances Part 7
Lifting machinery inspection and maintenance
Lifting machinery inspection and maintenance
Lifting machinery inspection and maintenance procedures
Crane Installation Regulations
Safety Regulations for Lifting Appliances Part 2
Safety Regulations for Lifting Appliances Part 4
GB/T 31052.4
GB/T 31052.4-2017
GM-4 grinding prototype weight
Lifting machinery safety inspection and maintenance procedures
Robotic arm industry

《GB/T 31052.4-2017起重机械 检查与维护规程 第4部分:臂架起重机》由TC227(全国起重机械标准化技术委员会)归口,主管部门为中国机械工业联合会。


Introduction

Standard Framework and Technological Evolution

VersionMain ChangesNew ContentImproved Safety Requirements
2017 VersionDetailed Inspection Items to 135Added Special Clauses for Container CranesStrengthened Inspection of Electronic Control Systems
Historical VersionsBasic RequirementsGeneral ClausesMainly Mechanical Structure

Core Inspection Requirements

Three-Level Inspection System

  • Daily inspection: carried out before daily operation, covering key components such as wire ropes and brakes
  • Periodic inspection: divided into weekly/monthly/quarterly/annual inspections, of which annual inspections require the completion of all 135 inspections
  • Special inspection: triggered by 15 special situations such as overload and collision

Examples of key inspection items

  1. Slewing bearingLubrication: every 500 working hours
  2. Hydraulic oil replacement: 2000 hours or annually
  3. Brake pad replacement: when the wear reaches 50%

Unplanned maintenance trigger conditions

  • Inspection found that Lifting gear lock Wear exceeds limit
  • Wire rope breakage rate reaches 10%
  • Control system abnormal alarm

Implementation suggestions

Enterprise application plan

ItemMethodStandardCycle
Structural weldsVisual inspection + non-destructive testingNo visible cracksAnnual inspection
LinksImplementation pointsRecord requirements
Inspection planDevelop in combination with work level (A1-A8)Retain original inspection form
Staff trainingKey training Appendix A/B project identificationAssessment record archiving
File managementInspection reports shall be kept for ≥5 yearsElectronic archiving

Countermeasures for technical difficulties

  • Application of non-destructive testing: TOFD detection is used for key welds of arm system
  • Electronic system verification: Add PLC program verification link

Special tips for safety precautions

  • Wind-resistant device inspection requires simulation of level 10 wind pressure test
  • Emergency stop system must be independent of PLC setting
  • Aerial work platform requires double guardrail design

Sample only — not a preview of GB/T 31052.4-2017
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend