Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
high-strength structural bolting assemblies preloaded high-strength scopethis part bolted connection pair ― part hydroelectric power plants control box mine water treatment
GB/T 32076.2-2015 in English

GB/T 32076.2-2015 in English

VALID

High-strength structural bolting assemblies for preloading―Part 2:Suitability for preloading

  • Issued on:2015-10-09
  • Implemented on:2016-06-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $160.00
$156.00
Standard No: GB/T 32076.2-2015
Document status: VALID
Title in English: High-strength structural bolting assemblies for preloading―Part 2:Suitability for preloading
Title in Chinese: 预载荷高强度栓接结构连接副 第2部分:预载荷适应性
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2015-10-09
Implemented on: 2016-06-01
ICS Classification: 21.060.10-Bolts, screws, studs
Chinese Classification: J13-Fastener
Professional Classification: GB-National Standard
Related Keywords: high-strength structural bolting assemblies
preloaded high-strength
scopethis part
bolted connection pair
― part
Related Topics: adaptability
structure prediction
load standard
Adaptive regulations
structure prediction
Loading Force vs. Hardness
highly predictive
load standard
carrier connection technology
GB connection
GB/T 32076.2
GB/T 32076.2-2015
load

《GB/T 32076.2-2015预载荷高强度栓接结构连接副 第2部分:预载荷适应性》由TC85(全国紧固件标准化技术委员会)归口,主管部门为中国机械工业联合会。
GB/T32076的本部分规定了预载荷高强度栓接结构连接副(以下简称栓接连接副)技术要求和试
验方法,以确保在金属结构中栓接连接副的预载荷适应性。
预载荷适应性试验规定了校核栓接连接副特性的方法,以保证按有关规定的拧紧方法达到要求的
预载荷及足够的安全系数,以防止超拧或断裂。
本部分适用于工业与民用建筑、桥梁、塔桅结构、锅炉钢结构、起重机械及其他钢结构用预载荷连接
的高强度螺栓连接副


Scope

This part of GB/T 32076 specifies the technical requirements and test methods for the preloaded high-strength bolted connection pair (hereinafter referred to as the bolted connection pair) to ensure the preload adaptability of the bolted connection pair in metal structures. The preload adaptability test specifies the method for checking the characteristics of bolted joints to ensure that the required preload and sufficient safety factor are achieved according to the relevant specified tightening methods to prevent overtightening or fracture. This part applies to industrial and civil building bridges, tower inspection structures, boiler steel structures, hoisting machinery and other high-strength bolt connections for preloaded steel structures.

Sample only — not a preview of GB/T 32076.2-2015
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend