| Standard No: | GB/T 33931-2017 |
| Document status: | VALID |
| Title in English: | Mine hoists―Head sheave and guide pulley―Requirements for repair process |
| Title in Chinese: | 矿井提升机 天轮和导向轮 修复工艺要求 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2017-07-12 |
| Implemented on: | 2018-02-01 |
| ICS Classification: | 73.100.40-Haulage and hoisting equipment |
| Chinese Classification: | D93-Promotion, storage and transportation equipment |
| Professional Classification: | GB-National Standard |
| Related Keywords: | repair process
repair process introduction repair process methods mine hoists guide sheave |
| Related Topics: | Guide wheel
Directed Repair GBT33931 GB/T 33931-2017 |
《GB/T 33931-2017矿井提升机 天轮和导向轮 修复工艺要求》由TC88(全国矿山机械标准化技术委员会)归口,主管部门为中国机械工业联合会。
Introduction
1. Background and significance of standard formulation
GB/T 33931—2017 "Requirements for the repair process of the top sheave and guide sheave of mine hoists" is to standardize the repair process of key components of mine hoists and ensure the safety and reliability of equipment. This standard is formulated based on the actual needs of the mining machinery industry and combines years of practical experience and technological progress.
2. Comparative analysis of standard frameworks
| Chapter | Content overview | Differences from GB/T10599 | Implementation focus |
|---|---|---|---|
| Scope (Chapter 1) | Clearly define the scope of application and repair process methods. | Added a distinction between single-rope winding type and multi-rope friction type. | Ensure that the equipment type is correctly identified. |
| Normative references (Chapter 2) | List all necessary reference standards. | Align with international general standards. | Ensure that the repair materials meet the requirements. |
| Repair process methods (Chapter 3) | Detailed provisions for defect handling and repair processes. | Added specific requirements for non-destructive testing. | Ensure that the repair quality is traceable. |
3. Implementation recommendations
Preparation before repair:It is recommended to conduct a comprehensive inspection of the equipment, record all defects, and develop a repair plan based on standard requirements.
Precautions during the repair process:Strictly follow the process flow, especially the sandblasting and painting process to ensure the anti-corrosion effect.
Verification after repair:Conduct a static balance test to ensure the stability of the equipment operation.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 15112-2017 in English
Shaft sinking winch
2017-07-12 -

GB/T 24503-2024 in English
Drive sprocket for chains (round link) for mining
2024-09-29 -

GB/T 25652-2026 in English
Aerial ropeways for underground mine—Design specification
2026-01-28 -

GB/T 40736-2021 in English
Mobile freight ropeway used in mining—Safety specifications
2021-10-11 -

GB/T 25707-2025 in English
Hydraulic defence explosion mine hoists and mine winders
2025-05-30 -

GB/T 37923-2019 in English
Trackless mining truck for open-pit mines—Safety requirements
2019-08-30 -

GB/T 33932-2017 in English
Forklift loaders for natural stone mining―Safety requirements
2017-07-12