GB/T 35128-2017 in English
VALIDCore components for group enterprise operating management information system
- Issued on:2017-12-29
- Implemented on:2018-07-01
- File Format:PDF
- Delivery:Via email within 5 business days
$418.00
《GB/T 35128-2017集团企业经营管理信息化核心构件》由TC159(全国自动化系统与集成标准化技术委员会)归口,TC159SC5(全国自动化系统与集成标准化技术委员会体系结构、通信和集成框架分会)执行,主管部门为中国机械工业联合会。
Introduction
Standard Framework and Technology Evolution
As an upgraded extension of GB/Z18728-2002 "Technical Specification for Functional Structure of Resource Planning System for Manufacturing Enterprises", this standard has established for the first time an information component system covering the entire value chain of group enterprises. Compared with traditional ERP standards, its innovation is reflected in:
| Comparison dimensions | GB/Z18728-2002 | GB/T 35128-2017 |
|---|---|---|
| Scope of application | Single manufacturing enterprise | Cross-regional group enterprise |
| Architecture level | Business execution layer | Strategy-operation-businessthree-tier architecture |
| Core components | 46 functional modules | 11 major systems182 standard components |
Core Analysis of Functional Architecture
4.1 Platform Architecture Model
In the three-dimensional architecture model proposed by the standard, the business intelligence system (A-1) supports strategic decision-making through the process of data collection → correlation analysis → visual output, and its stereotyped processing function supports the automation of complex operations.
4.2 Strategic Management and Control Areas
Typical Case: A central enterprise group implemented a standardized budget management system (A-3) to achieve:
- Budget preparation cycle shortened by 40%
- Automatic offset of internal transaction data with an accuracy rate of 99.2%
- Dynamic budget control covers 85% of cost items
Technical Specifications for Key Components
5.3.1 Equipment Management System
Standard RequirementsThe TPM Equipment Management System (B-6) must achieve:
- Automatic generation of preventive maintenance plans (based on equipment ledger + fault history)
- Real-time data connection with industrial control systems
- Group-level collaborative scheduling of maintenance resources
Implementation suggestions
| Implementation phase | Key tasks | Basis of standard clauses |
|---|---|---|
| Planning period | Determine the component coding system | 4.1 General principles |
| Construction period | Priority deployment of A-2 risk management system | Appendix A.2 |
| Operation and maintenance period | Establish a component version management system | 2.2 Component definition |
It is recommended that group companies refer to the functional unit granularity in the standard (such as C-1-4-5 inventory report) for system modular development to ensure component reusability.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 25103-2010 in English
Supply chain management business reference model
2010-09-02 -

GB/T 45024-2024 in English
Evaluation requirements of cloud manufacturing service
2024-11-28 -

GB/T 45349-2025 in English
Reference architecture of network collaborative manufacturing service platform supporting mass customization
2025-02-28