Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
power transformers power transformer capacity evaluation power evaluation guide below power transformers introduction gb/t transformer capacity evaluation plan parallel interface scopethis part iron brake shoes size jb/t 8821-1998
GB/T 35710-2017 in English

GB/T 35710-2017 in English

VALID

Rated power evaluation guide for 35 kV and below power transformers

  • Issued on:2017-12-29
  • Implemented on:2018-07-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $250.00
$243.00
Standard No: GB/T 35710-2017
Document status: VALID
Title in English: Rated power evaluation guide for 35 kV and below power transformers
Title in Chinese: 35kV及以下电压等级电力变压器容量评估导则
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2017-12-29
Implemented on: 2018-07-01
ICS Classification: 29.180-Transformers. Reactors
Chinese Classification: K41-Transformer
Professional Classification: GB-National Standard
Related Keywords: power transformers
power transformer capacity evaluation
power evaluation guide
below power transformers introduction gb/t
transformer capacity evaluation plan
Related Topics: Supercapacitor Voltage Window
Capacity in English
Isothermal pressure change
iec voltage class
Voltage and conductance
Five-stage conductivity detector
Conductometric Evaluation
Transformer capacity class
The voltage of the super capacitor
conductance voltage
conductance voltage
voltage specific capacity
Voltage and specific capacity
specific capacity voltage
GBT35710
GB/T 35710-2017
Voltage and specific capacity
Supercapacitor evaluation
Transformer energy consumption level new
Conductivity meter grade

《GB/T 35710-201735kV及以下电压等级电力变压器容量评估导则》由524(中国电力企业联合会)归口,主管部门为中国电力企业联合会。


Introduction

GB/T 35710—2017 Standard Overview

The National Standard of the People's Republic of China GB/T 35710—2017 "Guidelines for Capacity Assessment of Power Transformers of Voltage Levels 35kV and Below" was issued in 2017, which mainly provides detailed guidance specifications for capacity assessment of power transformers of voltage levels 35kV and below.

Standard Framework Comparison

Dimensions Contents Interpretation
Testing Conditions Testing Environment, Instrument Accuracy, Current and Voltage Transformer Requirements Ensure data accuracy and avoid external interference affecting test results.
Evaluation process Preset capacity assumptions, load loss calculation, short-circuit impedance correction Through step-by-step verification, determine whether the actual capacity of the transformer meets the standard.
Implementation suggestions Temperature rise test, capacity reduction treatment, actual application case analysis Optimize the transformer capacity evaluation plan based on site conditions and operating environment.

Interpretation of core clauses

Testing requirements (4.1-4.2)

GB/T 35710 specifies the necessary test conditions and items for power transformer capacity evaluation, including DC resistance, load loss, no-load loss and temperature rise test. These test items require the use of high-precision instruments and ensure that the test environment meets the standard requirements.

Evaluation method (5.2)

The standard details the specific steps of transformer winding DC resistance measurement, preset capacity assumptions, load loss calculation and short-circuit impedance correction. Through step-by-step verification, the accuracy and reliability of the evaluation results are ensured.

Implementation suggestions

In actual applications, the capacity assessment of power transformers needs to be combined with site conditions and operating environment, and the following implementation suggestions should be taken:

  • For oil-immersed transformers, focus should be placed on whether the temperature rise test results meet the requirements of GB/T1094.2.
  • For dry-type transformers, temperature rise tests should be carried out at the preset capacity, and the capacity level should be adjusted as needed.
  • During the evaluation process, if the short-circuit impedance deviation is found to exceed ±10%, the capacity should be re-assumed and verified in a timely manner.

Sample only — not a preview of GB/T 35710-2017
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend