GB/T 36115-2018 in English
VALIDTargeted poverty alleviation—Technical guide of village photovoltaic power station
- Issued on:2018-03-15
- Implemented on:2018-10-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$68.00
《GB/T 36115-2018精准扶贫 村级光伏电站技术导则》由TC564(全国微电网与分布式电源并网标准化技术委员会)归口,主管部门为中国电力企业联合会。
Introduction
National Standard of the People's Republic of China GB/T 36115—2018 Technical Guidelines for Targeted Poverty Alleviation Village-level Photovoltaic Power Stations
Background and Significance of Standard Formulation
As an important means of targeted poverty alleviation, village-level photovoltaic power stations provide clean energy and economic support for remote areas. The GB/T 36115—2018 standard aims to standardize design, construction, operation and maintenance to ensure the effectiveness of poverty alleviation.
Scope of Application and Core Content
Applicable to photovoltaic power stations of $500~\mathrm{kW}$ and below built in registered poor villages. It covers requirements in design, construction and installation, commissioning and acceptance, operation and maintenance, etc.
| Standard dimensions | Capacity range | Construction requirements | Technical specifications |
|---|---|---|---|
| Village-level PV power station | $500~\mathrm{kW}$ and below | Close to the grid, easy to operate and maintain | Comply with GB/T 9535 component standards |
| Multi-village joint construction | - | Applicable to areas without independent construction conditions | The inverter meets the grid-connected requirements |
Comparison of technical framework and standards
Actual Application Case Analysis
For example, a $200~\mathrm{kW}$ photovoltaic power station was built in a poor village, with a south-facing design to reduce the impact of mountain torrents. Polycrystalline silicon modules were selected with a conversion efficiency of no less than 17%.
Implementation Suggestions
- Site selection: Prioritize proximity to the power grid and avoid areas prone to natural disasters.
- Equipment selection: Select appropriate modules and inverters according to local climatic conditions.
- Grid-connected debugging: Ensure compliance with GB/T 50865 grid connection specifications and communication capabilities.
- Operation and maintenance: Train professionals, conduct regular inspections and data monitoring.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 44232-2024 in English
Technical specification for battery charge discharge controller of stand-alone photovoltaic system
2024-08-23 -

GB/T 37052-2018 in English
Test method for nominal module operating temperature of building integrated photovoltaic(BIPV)modules
2018-12-28 -

GB/T 19775-2005 in English
Glass-metal sealed heat-pipe evacuated solar collector tubes
2005-05-25 -

GB/T 23888-2009 in English
Controller for domestic solar water heating system
2009-06-01 -

GB/T 30152-2013 in English
Testing Code for Photovoltaic Generation System Connected to Distribution Network
2013-12-17 -

GB/T 44292-2024 in English
Electrostatic discharge susceptibility test for bypass diode applied in photovoltaic modules
2024-08-23 -

GB/Z 40104.103-2023 in English
Solar thermal electric plants—Part 1-3: General—Data format for meteorological data sets
2023-11-27 -

GB/T 44818-2024 in English
Technical specification at the project level for assessment of greenhouse gas emission reductions—Solar thermal applications
2024-10-26 -

GB/T 35694-2025 in English
Safety code of photovoltaic power station
2025-12-31 -

GB/T 6424-2021 in English
Flat plate solar collectors
2021-12-31