Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
automotive fuel-saving products single-line lubrication pump environmental factors scopethis standard applies
GB/T 36285-2018 in English

GB/T 36285-2018 in English

VALID

Specification of steam turbine electro-hydrauli ccontrol system for thermal power plant

  • Issued on:2018-06-07
  • Implemented on:2019-01-01
  • File Format:PDF
  • Delivery:Within 1 day
Price(USD): $320.00
$311.00
Standard No: GB/T 36285-2018
Document status: VALID
Title in English: Specification of steam turbine electro-hydrauli ccontrol system for thermal power plant
Title in Chinese: 火力发电厂汽轮机电液控制系统技术条件
Language: English
File Format: Electronic (PDF)
Delivery: Within 1 day
Issued on: 2018-06-07
Implemented on: 2019-01-01
ICS Classification: 27.100-Power stations in general
Chinese Classification: N17-Automatic control and remote control equipment
Professional Classification: GB-National Standard
Related Topics: steam turbine
thermal power plant steam turbine numbers
Technical regulations for operation, maintenance and testing of steam turbine digital electro-hydraulic control system in thermal power plants
liquid phase technology
electric control
thermal power plant
GBT36285
GB/T 36285-2018
Thermal power generation steam turbine design
Thermal power plant debugging technology
Electronic control system technology

《GB/T 36285-2018火力发电厂汽轮机电液控制系统技术条件》由TC376(全国电站过程监控及信息标准化技术委员会)归口,主管部门为中国电力企业联合会。


Introduction

Analysis of the core content of the standard

This standard specifies the technical requirements for the steam turbine electro-hydraulic control system (DEH) in terms of functional design, performance indicators, hardware configuration, hydraulic execution, etc. It is mainly applicable to units with a capacity of 300MW and above, and other capacity units can refer to it. The standard emphasizes reliability design and safety protection mechanism, and clearly states that the system service life shall not exceed 10 years.


Comparison of key technical requirements

Technical dimension Electronic control device Hydraulic system
Redundancy configuration Controller/network/power supply triple redundancy Important protection function redundancy
Response time OPC logic≤20ms Control valve fast closing≤0.3s(200MW+)
Environmental adaptability Temperature-25℃~55℃ Oil temperature15℃~60℃
Accuracy requirements AI signal±0.1% Valve position control±0.2%

Typical application cases

Implementation of overspeed protection system (OPT)

In the DEH transformation of a 600MW unit, according to Clause 7.4.2 of the standard: the speed sensor adopts three-out-of-two logic. When the speed is ≥103% of the rated speed, all steam inlet valves are closed within 0.3 seconds through the electro-hydraulic servo valve. Actual tests show:

  • Action delay time: 18ms (standard requirement ≤20ms)
  • Full closing time: 280ms (standard requirement ≤300ms)

Standard Evolution Analysis

Compared with the old version of the standard, the 2018 version mainly strengthens:

  1. Network security requirements: Increase the communication network load rate limit (Ethernet ≤20%)
  2. Hardware reliability: Clarify the EMC test level (the on-site environment must meet GB/T17626.3 Level 3)
  3. Hydraulic system fire protection: It is mandatory to use Sch80 thick-walled pipes for fire-resistant oil pipes

Implementation suggestions

Design stage

It is recommended to use the Triple Modular Redundancy (TMR) architecture to realize speed signal acquisition, which meets the requirements of standard 6.3.4. Typical cases show that this design can make the system availability reach 99.99%.

Acceptance test

According to clause 10.1.3 of the standard, the following points need to be verified:

  • OPC function test: simulate 103% speed trigger condition
  • Valve fast closing time test: use high-speed recorder to collect oil motor displacement curve
  • Power switching test: dual UPS switching time ≤10ms

Sample only — not a preview of GB/T 36285-2018
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend