GB/T 36410.3-2018 in English
VALIDEnergy consumption evaluation methods of port equipment—Part 3:Bridge type grab ship unloader
- Issued on:2018-06-07
- Implemented on:2019-01-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$156.00
| Standard No: | GB/T 36410.3-2018 |
| Document status: | VALID |
| Title in English: | Energy consumption evaluation methods of port equipment—Part 3:Bridge type grab ship unloader |
| Title in Chinese: | 港口设备能源消耗评价方法 第3部分:桥式抓斗卸船机 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2018-06-07 |
| Implemented on: | 2019-01-01 |
| Chinese Classification: | R46-Port handling machinery and accessory |
| Professional Classification: | GB-National Standard |
| Related Keywords: | port equipment part
energy consumption evaluation methods bridge type grab ship bridge grab ship unloaders height evaluation method unit energy consumption calculation energy efficiency rating classification |
| Related Topics: | energy consuming equipment
GB/T 36410.3 GB/T 36410.3-2018 Mechanical equipment energy consumption |
《GB/T 36410.3-2018港口设备能源消耗评价方法 第3部分:桥式抓斗卸船机》由TC530(全国港口标准化技术委员会)归口,主管部门为交通运输部。
Introduction
1. Background and significance of the standard
GB/T 36410 "Evaluation Methods for Energy Consumption of Port Equipment" is divided into 5 parts. This part (Part 3) focuses on the energy efficiency evaluation of bridge grab ship unloaders. This standard was proposed by the Ministry of Transport of China and aims to standardize the energy consumption detection and evaluation methods of bulk material handling equipment in ports.
2. Comparison of standard frameworks
| Standard dimensions | Part 1: Shore container cranes | Part 2: Rail-mounted container gantry cranes | Part 3: Bridge grab ship unloaders |
|---|---|---|---|
| Scope of application | Container loading and unloading equipment | Rail-mounted gantry cranes | Bulk material loading and unloading bridge grab ship unloaders |
| Testing requirements | Rated load, operating speed | Rail length, span | Grab fill rate, lifting height |
| Evaluation method | Unit energy consumption calculation | Energy efficiency rating classification | Grading evaluation based on rated productivity |
3. Recommendations for standard implementation
3.1 Equipment selection and procurement
In the process of purchasing port equipment, bridge grab ship unloaders with high energy efficiency ratings should be given priority. It is recommended that users select products that meet the GB/T 36410.3 standard according to actual loading and unloading needs, and refer to the energy efficiency rating table in Appendix B for evaluation.
3.2 Operation and maintenance
In order to ensure the long-term and efficient operation of the equipment, it is recommended to regularly inspect and maintain the power system, grab mechanism and travel mechanism of the ship unloader. Especially in high-load operating environments, the management of the lubrication and cooling systems should be strengthened.
3.3 Data Recording and Analysis
According to the test report template in Appendix A, it is recommended that port enterprises establish energy efficiency data archives and regularly collect statistics and analyze the unit energy consumption of ship unloaders. Through horizontal comparison and vertical tracking, optimize equipment operating parameters.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 36410.2-2018 in English
Energy consumption evaluation methods of port equipment—Part 2:Rail mounted container gantry crane
2018-06-07 -

GB/T 36410.5-2018 in English
Energy consumption evaluation methods of port equipment—Part 5:Port tractor
2018-06-07 -

GB/T 36410.4-2018 in English
Energy consumption evaluation methods of port equipment—Part 4:Bulk ship loader
2018-06-07