Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
on-site evaluation meeting core evaluation dimension ecological environment evaluation process requirements core evaluation dimensions village construction ≥15 % infrastructure integrity collective economic income characteristic evaluation mechanism resistant automobile equipments introductionthis document wheat quality northeast cold vortex intensity index
GB/T 37072-2018 in English

GB/T 37072-2018 in English

VALID

Evaluation for the construction of beautiful villages

  • Issued on:2018-12-28
  • Implemented on:2018-12-28
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $370.00
$359.00

《GB/T 37072-2018美丽乡村建设评价》由424-cnis(中国标准化研究院)归口,主管部门为国家标准化管理委员会。


Introduction

Standard Framework and Core Contents

First-level indicators Weight requirements Core evaluation dimensions
Village construction ≥15% Infrastructure integrity, planning implementation, public facilities coverage rate
Ecological environment ≥25% Pollution control rate, ecological protection measures, resource recycling
Economic development ≥20% Industrial integration, cultivation of new business entities, collective economic income

Characteristic evaluation mechanism

The standard innovatively adopts a two-layer indicator structure:

  1. Basic items (78 items): mandatory indicators such as the hardening rate of village main roads and the harmless treatment rate of domestic waste
  2. Strengthening items (22 items): guiding indicators such as ecological sewage treatment facilities and rural characteristic culture

Typical case: Anji County, Zhejiang Province

Accurate evaluation is achieved through quantitative indicators: the forest and grass coverage rate (mountainous areas) reached 92%, the domestic sewage treatment rate was 85%, and a market-oriented management and maintenance mechanism was established. The comprehensive evaluation score exceeded 95 points for three consecutive years.


Analysis of key technical indicators

Indicator name Calculation formula Meeting threshold
Agricultural film recycling rate Recycled amount/usage amount×100% ≥90% (Grade A)
Nine-year compulsory education consolidation rate Number of junior high school graduating classes/Number of students enrolled×100% ≥93%
Villager satisfaction weight Average questionnaire score×10% ≥80 points

Suggestions for the implementation of the standard

  • Data collection: It is recommended to use remote sensing monitoring + Internet of Things sensors to obtain real-time data on the ecological environment
  • Evaluation process: Strictly follow the "three meetings and one check" procedure stipulated in Article 6.4 (work arrangement meeting, on-site evaluation meeting, result briefing meeting + supporting material verification)
  • Innovative application: You can apply for special bonus points in combination with the 101 innovative practice indicators in Appendix B

Analysis of standard evolution

Compared with GB/T 32000-2015 "Guidelines for the Construction of Beautiful Villages", the main breakthroughs of this standard are:

  1. Added villager satisfaction as a core evaluation dimension (weight ≥10%)
  2. Refine the calculation method of 22 quantitative indicators (Appendix A)
  3. Establish a four-level scoring system (A/B/C/D) to replace the original pass/fail evaluation

Sample only — not a preview of GB/T 37072-2018
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend