GB/T 38357-2019 in English
VALIDSpecifications for project tendering agency service
- Issued on:2019-12-31
- Implemented on:2019-12-31
- File Format:PDF
- Delivery:Via email within 1~3 business days
$243.00
| Standard No: | GB/T 38357-2019 |
| Document status: | VALID |
| Title in English: | Specifications for project tendering agency service |
| Title in Chinese: | 招标代理服务规范 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2019-12-31 |
| Implemented on: | 2019-12-31 |
| Professional Classification: | GB-National Standard |
| Related Keywords: | service provision specifications
agency service introduction core framework standard industry practice service stage division service contents service fees |
| Related Topics: | bidding
acting Inter-turn bidding tank tender q+ bidding be tendered Bidding was trick Tender result Agency service Peptide Tenders xenon tender Sample bidding GBT38357 Non-tendering procurement agency services Tendering agency services |
《GB/T 38357-2019招标代理服务规范》由TC264(全国服务标准化技术委员会)归口,主管部门为国家标准化管理委员会。
Introduction
Core framework of the standard
| Dimensions | 2019 version of the standard | Industry practice |
|---|---|---|
| Service stage division | 5 major stages and 21 service contents | Usually 3-4 stages |
| Informatization requirements | Explicit requirement to establish a basic database | Not mandatory requirement |
| Risk control | Pre-risk assessment mechanism | Mainly post-processing |
Innovation in Terminology System
This standard clearly defines 8 core terms such as bidding agency, among which "centralized bidding" (Article 3.8) is defined at the national standard level for the first time, referring to the model of merging bidding for repeated and scattered objects.
Service provision specifications
6.5 Key points of contract signing
- Must include 12 basic clauses (Article 4.3.1.2)
- Electronic bidding needs to clarify the division of responsibilities and powers of the electronic trading platform
- Six major factors need to be considered in determining service fees (Article 4.3.1.3)
Implementation suggestions
A case study on standardization of bidding agents for a central enterprise
By establishing a three-level quality review mechanism to implement Article 7.2 of the external evaluation requirements, the project complaint rate has dropped by 42%
Technology evolution analysis
Compared with industry practices, this standard highlights:
- Full process service traceability (Article 4.1.1 Quality management system)
- List of value-added services (Article 5.3, 5 types of value-added services)
- Special agreement on electronic bidding (Article 4.3.1.4)

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 20042.6-2024 in English
Proton exchange membrane fuel cell—Part 6:Test method of bipolar plate properties
2024-03-15 -

GB/T 5680-2023 in English
Austenitic manganese steel castings
2023-05-23 -

GB/T 17705-1999 in English
Sales data report message
1999-03-02 -

GB/T 30357.4-2015 in English
Oolong tea―Part 4:Shuixian
2015-07-03 -

GB/T 34875-2017 in English
Shaft sealing systems for centrifugal and rotary pumps
2017-11-01 -

GB/T 8693-2008 in English
Textiles—Designation of yarns
- -

GB/T 22148.2-2014 in English
Test method on electromagnetic emissions―Part 2: Electronic control gear for discharge lamps excluding fluorescent lamps
2014-12-22 -

GB/T 4937.34-2024 in English
Semiconductor devices—Mechanical and climatic test methods—Part 34:Power cycling
2024-03-15 -

GB/T 14989-2015 in English
Iron-cobalt-vanadium permanent-magnet alloys
2015-12-10 -

GB 1476-1979 in English
Tellurium
-