Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
scientific pest risk assessment high-altitude meteorological detection system small combined machine tools
GB/T 39184-2020 in English

GB/T 39184-2020 in English

VALID

Code of practice for installation and commissioning of ROV launch and recovery system/umbilical winch

  • Issued on:2020-10-11
  • Implemented on:2021-05-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $250.00
$243.00
Standard No: GB/T 39184-2020
Document status: VALID
Title in English: Code of practice for installation and commissioning of ROV launch and recovery system/umbilical winch
Title in Chinese: ROV收放装置/脐带绞车安装与调试规程
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2020-10-11
Implemented on: 2021-05-01
ICS Classification: 47.020.99-Other standards related to shipbuilding and marine structures
Chinese Classification: U16-Auxiliary vessels and survey vessels
Professional Classification: GB-National Standard
Related Topics: debugging
umbilical cord
Installation and commissioning process
GBT39184
GB/T 39184-2020
Pneumatic winch installation

《GB/T 39184-2020ROV收放装置/脐带绞车安装与调试规程》由TC12(全国海洋船标准化技术委员会)归口,主管部门为国家标准化管理委员会。


Introduction

Interpretation of the core content of the standard

GB/T39184-2020 standard systematically regulates the entire installation and commissioning process of ROV retractable device and umbilical winch, covering the technical requirements of three types of typical hanger structures (single hanging point type, sliding trolley type, moon pool track type). This standard is applicable to the construction acceptance of ships and marine engineering equipment.


Comparison of key technical indicators

Parameter category Single suspension point type Sliding crane type Moon pool track type
Installation surface flatness ≤1mm/2m ≤1mm ≤2.5mm
Guide rail parallelism - ≤2.5mm ≤4mm
Welding standard Comply with GB50661 steel structure welding specification, weld height error ≤ 0.5mm

Installation key control points

1. Welding quality control

The standard requires the use of symmetrical welding and intermittent welding processes to control deformation, and ultrasonic flaw detection is required inside the weld, and the defect detection rate should be <0.2%. Typical cases show that the moon pool track needs to be aged for 24 hours after welding.

2. Bolt tightening standards

The torque values of bolts made of different materials vary significantly. Take M16 bolts as an example:
- Grade 8.8: 195N·m (dry type)
- 316 stainless steel: 135N·m (wet type)
Use a calibrated torque wrench to tighten in three times.


Key points for debugging implementation

Mooring debugging phase

  • Load test: Static load (10 minutes hold) and dynamic load (3 cycles) tests are required
  • Hydraulic system: Safety valve opening pressure deviation should be ≤5% of rated value

Navigation debugging phase

  • Wave compensation: Activation depth threshold error should be <0.5m
  • Emergency brake: Braking time of the hanger should be ≤2 seconds

Standard evolution analysis

Compared with the earlier industry specifications, this standard adds:
1. Special technical requirements for moon pool track structure
2. Digital debugging data recording requirements (Appendix A/B)
3. Thermal deformation control indicators during welding process

Sample only — not a preview of GB/T 39184-2020
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • GB/T 39206-2020 in English

    GB/T 39206-2020 in English

    Code of practice for installation and commissioning of fixed azimuth thruster

    2020-10-11
  • GB/T 39230-2020 in English

    GB/T 39230-2020 in English

    Code of practice for installation and commissioning of heavy duty submarine cable recovery and releasing device

    2020-11-19