Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)

Installation and commissioning process

Installation and commissioning process, Total:64 items.

The international standard classification for "Installation and commissioning process" includes: Other standards related to shipbuilding and marine structures .

The Chinese standard classification for "Installation and commissioning process" includes: Auxiliary vessels and survey vessels , Power capacitor .


Henan Provincial Standard of the People's Republic of China

  • DB41/T 2706-2024 Technical regulations for installation of civil air defense doors in civil air defense projects

Professional Standard - Energy

  • NB/T 11575-2024 Technical regulations for installation and commissioning of collectors for parabolic trough solar thermal power stations
  • NB/T 11193-2023 Code of practice for installation and commission of ring gate for hydraulic turbines

General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

  • GB/T 39184-2020 Code of practice for installation and commissioning of ROV launch and recovery system/umbilical winch
  • GB/T 39230-2020 Code of practice for installation and commissioning of heavy duty submarine cable recovery and releasing device
  • GB/T 39207-2020 Code of practice for installation and commissioning of anchor handling system
  • GB/T 39208-2020 Code of practice for installation and commissioning of retractable azimuth thruster
  • GB/T 39206-2020 Code of practice for installation and commissioning of fixed azimuth thruster

Group Standards of the People's Republic of China

  • T/CES 019-2018 Commissioning standards for EHV transmission and distribution system
  • T/ZS 0017-2018 Technical regulations for installation and commissioning of lighting control systems and lamps
  • T/CWEA 30-2025 Installation regulations for oblique axial flow pumps
  • T/SEPA 001-2020 Commissioning method of phase selection and closing device in HVDC converter station
  • T/CSEE 0203.4-2023 Flexible DC equipment commissioning procedures Part 4: AC energy consumption devices
  • T/CEC 556-2021 Guidelines for installation, commissioning, operation and maintenance of high-voltage AC cable on-line monitoring device
  • T/CIET 661-2024 Nanofiltration water treatment system installation and commissioning procedures
  • T/CMTBA 2002-2020 Power-operated chucks—Mounting regulating & maintenance
  • T/CAMS 84-2021 Motors for HVAC axial fan -Installation dimentions
  • T/QGCML 622-2023 10kV switching station debugging process specification
  • T/CAR 2-2019 Technical specification for room air conditioner installation and maintenance
  • T/QGCML 1555-2023 Mining face installation process
  • T/UNP 590-2025 Specification for installation and commissioning of electrical engineering equipment

Professional Standard - Energy and Power Planning

  • DL/T 2758-2024 Installation and commissioning procedures for static variable frequency starting equipment in pumped storage power stations
  • DL/T 2737-2024 Installation and acceptance regulations for turbine regulating systems and devices
  • DL/T 5292-2013 Code of System Commissioning for 1000kV AC Transmission and Transformation Project
  • DL/T 5232-2010 Specification for construction and acceptance of electric equipments in ±800kV & under converter station

Professional Standard - Speciality

  • ZB T36012-1989 Installing Dimensions of DC Generator Regulator for Automobile

Professional Standard - Petroleum

  • SY/T 5967-1994 Installation, commissioning and maintenance of drilling well control devices

Professional Standard - Labor and Labor Safety

  • LD/T 74.4-2008 Construction engineering labor quota installation engineering - ventilation and air conditioning engineering

American Society for Testing and Materials (ASTM)

  • ASTM E3010-15 Standard Practice for Installation, Commissioning, Operation, and Maintenance Process (ICOMP) of Photovoltaic Arrays
  • ASTM E3010-15(2019)e1 Standard Practice for Installation, Commissioning, Operation, and Maintenance Process (ICOMP) of Photovoltaic Arrays
  • ASTM E3010-15(2025) Standard Practice for Installation, Commissioning, Operation, and Maintenance Process (ICOMP) of Photovoltaic Arrays

American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE)

Association of German Mechanical Engineers

Association Francaise de Normalisation

Society of Automotive Engineers (SAE)

  • SAE AIR6364 Test Facility Shakedown and Commissioning

Standards New Zealand

American National Standards Institute (ANSI)

Standard Association of Australia (SAA)

Finnish Standards Institute

  • SFS 5329-1987 Air conditioning device. Regulators for constant airflow and varying airflow. test

Ente Nazionale Italiano di Unificazione

  • UNI ISO 6263:1999 Hydraulic fluid power - Compensated flow-control valves - Mounting surfaces
  • UNI 8275:1981 Gas-fired appliances. Interception, adjustment and safety devices. Requirements.

British Standards Institution (BSI)

  • DD ENV 50231:1997 Aeronautical ground lighting electrical installation. Constant current regulator. Equipment specifications and tests
  • DD ENV 50231:1997(1999) Constant current regulators for aviation ground lighting electrical installations: Equipment specifications and tests

Australian/New Zealand Standard (AU-AS/NZS)

  • AS/NZS 4240.1:2009 Design, construction, testing, installation and commissioning of remote control systems for mining equipment

Türk Standardları Enstitüsü

  • TS 3419-1979 PRINCIPLES FOR THE PREPARATION OF THE PROJECTS OF VENTILATION AND AIR CONDITIONING INSTALLATION
  • TS 3420-1979 PRINCIPLES FOR THE DISPOSITION OF VENTILATION AND AIR CONDITIONING INSTALLATIONS

American Petroleum Institute (API)

  • API TR 2578-2017 Flow Conditioner Installation and Effects on Turbine Meters (FIRST EDITION)

National Electrical Contractors Association (NECA)

  • NECA 700-2016 Standard for Installing Overcurrent Protection to Achieve Selective Coordination