Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
test method upgrade particle size determination fluosilicic acid recovery method wind turbine operations
GB/T 40102-2021 in English

GB/T 40102-2021 in English

VALID

Test code of connecting to power system for solar thermal power plants

  • Issued on:2021-05-21
  • Implemented on:2021-12-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $160.00
$156.00
Standard No: GB/T 40102-2021
Document status: VALID
Title in English: Test code of connecting to power system for solar thermal power plants
Title in Chinese: 太阳能热发电站接入电力系统检测规程
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2021-05-21
Implemented on: 2021-12-01
ICS Classification: 27.160-Solar energy engineering
Chinese Classification: F12-Solar energy
Professional Classification: GB-National Standard
Related Topics: Power Systems
power station
gbt 20840.2
Power station test system
One-stop detection capability designation
One-stop testing capability
Solar testing equipment
solar thermal
thermal power station
Motor Detection System
The current cutting edge of solar power
High-efficiency solar power generation system
Inspection procedures
Solar panels on the space station
GBT40102
GB/T 40102-2021
Grounding of communication solar power point system
Power Station Engineering 5161
ossila solar cell iv test system
Calibration procedures for electric hot plates
Solar power supply system energy saving
gb40102

《GB/T 40102-2021太阳能热发电站接入电力系统检测规程》由TC565(全国太阳能光热发电标准化技术委员会)归口,主管部门为中国电力企业联合会。


Introduction

Analysis of the technical framework of the standard

This standard applies to thermal storage solar thermal power stations using steam turbine generator sets, and specifies a complete testing system from startup test to AVC system test. The standard highlights the differences in testing requirements between new energy power stations and traditional thermal power stations.

Comparison of core test items

Test items Test conditions Key indicators Reference standards
Start/Shutdown test Cold/Warm/Hot Load response time -
Primary frequency modulation test 30%/65%/90%PN Response lag time≤3s DL/T1235
AGC system test 20-100%PN Regulation rate ≥1.5%PN/min -

Key technical requirements for measuring instruments

The standard clearly requires that the data acquisition device must meet the following requirements:

  • Sampling frequency ≥10kHz
  • Bandwidth ≥2kHz
  • Comprehensive accuracy Level 0.5
Voltage/current transformers must comply with the requirements of the GB/T20840 series standards.


Implementation suggestions

Typical problem solving solutions

For the common PSS parameter setting problems in detection, it is recommended that:

  1. Frequency domain method recommended by DL/T1231 should be used for testing
  2. The phase compensation range should be controlled within ±30°
  3. Pay attention to the thermal inertia effect of the heat storage system during on-site verification

Key points for test report preparation

The report should include: Power station heat storage capacity configuration parametersMeasured curves of each operating pointDeclaration of conformity with GB/T40103

Technology evolution analysis

Compared with traditional power generation standards, this document clarifies for the first time:

  • Differentiated detection requirements under multiple thermal states (cold/warm/hot)
  • Joint test method of thermal storage system and power generation unit
  • Consideration of solar irradiation-heat storage-power generation coupling characteristics unique to CSP power stations

Sample only — not a preview of GB/T 40102-2021
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend