Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
farm requirements photovoltaic power station requirements renewable energy station introduction analysis energy dispatch technical requirements innovative network security monitoring requirements bombyx moril sound reverberation time albumin determination reagents
GB/T 40604-2021 in English

GB/T 40604-2021 in English

VALID

Information exchange technical requirements for energy dispatch and operation of renewable energy station

  • Issued on:2021-08-20
  • Implemented on:2022-05-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $280.00
$272.00
Standard No: GB/T 40604-2021
Document status: VALID
Title in English: Information exchange technical requirements for energy dispatch and operation of renewable energy station
Title in Chinese: 新能源场站调度运行信息交换技术要求
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2021-08-20
Implemented on: 2022-05-01
Professional Classification: GB-National Standard
Related Keywords: farm requirements photovoltaic power station requirements
renewable energy station introduction analysis
energy dispatch
technical requirements
innovative network security monitoring requirements
Related Topics: scheduling
new energy
Suohe Energy Energy Station
Energy Information Administration
Depot
Energy Information Administration
field tone parallel sample
altitude information
GBT40604
GB/T 40604-2021
New energy station dispatching operation information exchange
q/gdw 12052-2020 Electrochemical energy storage power station dispatching and operation information technology
New energy standards

《GB/T 40604-2021新能源场站调度运行信息交换技术要求》由TC446(全国电网运行与控制标准化技术委员会)归口,主管部门为中国电力企业联合会。


Introduction

Analysis of the core content of the standard

This standard systematically regulates the full-business information interaction system between new energy stations and dispatching agencies for the first time. The main technical breakthroughs are reflected in:

  • A four-level operation status model is established: normal power generation, off-site restrictions, on-site restrictions, standby and other states are clearly defined
  • Innovative network security monitoring requirements are proposed: it is required to deploy network security monitoring devices to achieve full-factor monitoring of host/network/security equipment
  • Detailed time performance indicators: such as SOE resolution ≤1ms, PMU data delay ≤50ms, etc.

Comparative analysis of key technologies

Technical elements Wind farm requirements Photovoltaic power station requirements Common requirements
Access voltage level ≥35kV ≥10kV and ≥6MW RTU/monitoring system required
Environmental monitoring 4th floor data of wind tower (10-70m) Total radiation/direct/scattered irradiance Data availability>99%
Power control Adjustment period 4-16s Same as left Remote adjustment accuracy ≥99.9%

Typical application scenarios

Case 1: Wind power AGC control

A 300MW wind farm uploaded the unit status in real time through the telecontrol communication terminal (Standard 5.1.1 clause), and the dispatching master station issued power adjustment instructions according to 5.3.1.4 clause, and the measured response delay was ≤3.2s (better than the standard 4s requirement).

Case 2: Photovoltaic grid-related protection

According to 6.5.1.2 clause, a 200MW photovoltaic power station was equipped with a fault recording device to record data from 200ms before the fault to 6s after the fault, and successfully located a collector grounding fault.


Analysis of Standard Evolution

Compared with the early NB/T series industry standards, this standard has the following major improvements:

  1. Expanded data scope: New data such as network security monitoring (Chapter 5.9/6.9) and subsynchronous oscillation monitoring (Article 5.4.1.2)
  2. Improved timeliness index: Increased SOE resolution from 10ms to 1ms
  3. Unified communication protocol: Clarified the application scenarios of 8 protocols such as DL/T634.5104

Implementation suggestions

  • Equipment selection: Select PMU devices that support GB/T26865.2 protocol
  • System transformation: Improve the IEC104 communication interface of the monitoring system in accordance with Article 4.2
  • Test verification: Focus on testing the ultra-short-term power prediction data delay in clause 5.6.2

Sample only — not a preview of GB/T 40604-2021
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend