Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
modular data centers introduction core framework a data center grade b data center test methods power distribution system dual-path system-level infrastructure specification system general specification modular integration degree ppue lightning protection zone concept pretensioned spun concrete field naming
GB/T 41783-2022 in English

GB/T 41783-2022 in English

VALID

General specification for modular data centers

  • Issued on:2022-10-12
  • Implemented on:2023-05-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $310.00
$301.00

《GB/T 41783-2022模块化数据中心通用规范》由TC28(全国信息技术标准化技术委员会)归口,TC28SC39(全国信息技术标准化技术委员会信息技术与可持续发展分会)执行,主管部门为国家标准化管理委员会。


Introduction

Core framework and technical characteristics

The standard establishes a system-level infrastructure specification system, and clearly classifies the design according to the dual-row/single-row/compact architecture, among which the modular integration degree PPUE becomes the core technical indicator.


Technical Requirements Analysis

Core System Grade A Data Center Grade B Data Center Test Methods
Power Distribution System Dual-Path 2N Redundancy N+1 Redundancy Harmonic Analyzer Detection
Refrigeration System n+x Redundancy Topology Dual Refrigeration Pipes Pressure Differential Dynamic Test
Security System Ultra-Early Fire Alarm Linkage Infrasound Monitoring Intelligent inspection equipment

Deployment planning recommendations

  • In the planning stage, compromise assessment should be prioritized to eliminate electromagnetic interference and geological risks
  • CFD simulation should be introduced into the air flow organization design, and the pressure difference between the cold and hot channels should be controlled at 30Pa±5
  • In the packaged line design, the maintenance channel should be pre-controlled, and the maintenance opening should be ≥800mm

Energy efficiency evaluation system

Innovatively construct a multi-climate zone modeling test solution, use the track-to-track mapping method to simulate the 35℃/25℃/15℃ characteristic conditions, and introduce the temperature correlation coefficient to accurately calculate the dynamic zhPUE index throughout the year.

Typical case: A supercomputing center reduced the mpPUE equivalent value to 1.28 by improving the refrigerant valve group and active control.

Sample only — not a preview of GB/T 41783-2022
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend