Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
accurate temperature monitoring ascorbic acid series solutions general requirements sterile
GB/T 42150.1-2022 in English

GB/T 42150.1-2022 in English

VALID

Test specification for on-site protection equipment—Part 1:General part

  • Issued on:2022-12-30
  • Implemented on:2023-07-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $310.00
$301.00
Standard No: GB/T 42150.1-2022
Document status: VALID
Title in English: Test specification for on-site protection equipment—Part 1:General part
Title in Chinese: 就地化继电保护装置检测规范 第1部分:通用部分
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2022-12-30
Implemented on: 2023-07-01
ICS Classification: 29.240-Power transmission and distribution networks
Chinese Classification: K45-Relay protection and automatic device
Professional Classification: GB-National Standard
Related Topics: Relay protection device
Testing specification
relay protection
change first
Relay protection device
Inspection procedures for relay protection devices
Passive protection device detection

《GB/T 42150.1-2022就地化继电保护装置检测规范 第1部分:通用部分》由524(中国电力企业联合会)归口,主管部门为中国电力企业联合会。


Introduction

GB/T 42150.1-2022 Standard Overview

With the development of power systems, local relay protection devices have become an important technical direction due to their high efficiency and reliability. This standard specifies their testing requirements to ensure the performance of the device under various environments and operating conditions.

Background of Standardization and Technological Evolution

Dimension Traditional protection device Localized relay protection device
Installation location Concentrated in the control room Close to primary power equipment
Response time Long (dependent on communication network) Extremely short, direct action
Environmental adaptability Limited protection level High protection level (such as IP66)

Key test items and technical requirements

Insulation test and dielectric strength test

Insulation resistance requirements: The insulation resistance of the device's external live circuit to the ground and between different circuits should not be less than 100MΩ.

Withstand voltage test voltage: The rated insulation withstand voltage is 2.89kV when it is 63V~250V, and 0.723kV when it is not greater than 63V, and there is no breakdown or flashover for 1 minute.

Application case: A substation device passed the dielectric strength test under high temperature and high humidity, proving that its insulation performance is stable.

Electromagnetic compatibility (EMC) test requirements

  • Radiated emission: Peak scan and quasi-peak test to ensure that the interference signal is within the limit.
  • Conducted emission: Reduce conducted interference through filters and shielding measures.
  • Fast transient immunity:Simulate the pulse group of lightning strikes or disconnection of inductive loads to verify the device's tolerance.

Implementation suggestions

  1. Test preparation:Ensure that the test equipment is accurately calibrated and be familiar with the requirements in the standard.
  2. Test sequence:Prioritize structural and appearance inspections, and then carry out key tests such as insulation and electromagnetic compatibility.
  3. Result analysis:Record the test data in detail and compare it with the technical requirements to determine whether it meets the specifications.

Sample only — not a preview of GB/T 42150.1-2022
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend