GB/T 22384-2024 in English
VALIDInspection specification for security and stability control system of power system
- Issued on:2024-10-26
- Implemented on:2025-05-01
- File Format:PDF
- Delivery:Via email within 5 business days
$495.00
| Standard No: | GB/T 22384-2024 |
| Document status: | VALID |
| Title in English: | Inspection specification for security and stability control system of power system |
| Title in Chinese: | 电力系统安全稳定控制系统检验规范 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 5 business days |
| Issued on: | 2024-10-26 |
| Implemented on: | 2025-05-01 |
| Superseding: |
GB/T 22384-2008 Testing specification of security and stability control system for power system
|
| ICS Classification: | 29.240-Power transmission and distribution networks |
| Chinese Classification: | K45-Relay protection and automatic device |
| Professional Classification: | GB-National Standard |
| Related Keywords: | partial inspection system transmission test
channel inspection inspection specification joint inspection on-site inspection |
| Related Topics: | Foreign pressure control system
|
《GB/T 22384-2024电力系统安全稳定控制系统检验规范》由524(中国电力企业联合会)归口,主管部门为中国电力企业联合会。
Introduction
Core changes in standards and technological evolution
| Dimensions | 2008 Edition | 2024 Edition |
|---|---|---|
| Test methods | Mainly static test | Added dynamic whole group test + real-time digital simulation |
| Network security | Not specified | Added GB/T 36572 protection requirements |
| Test cycle | Fixed cycle | Allowed status maintenance adjustment |
| Intelligent station inspection | Not covered | Added SV/GOOSE message inspection |
Analysis of key inspection items
Key points for dynamic test implementation
The new standard requires that the following must be carried out for scenarios such as new stabilization devices and DC control and protection interfaces:
- The real-time digital simulation platform needs to build a complete primary system model
- The action reliability of the fixed value range of 0.95-1.05 times needs to be verified
- The interface test of the new energy control system needs to include power modulation timing verification
Special requirements for smart substations
| Inspection items | Traditional stations | Smart stations |
|---|---|---|
| Sampling test | Analog input | SV message reception test |
| Open-in test | Hard contact test | GOOSE communication interruption check |
| Insulation test | 1000V megohmmeter | ICD model connection needs to be disconnected |
Implementation suggestions
Inspection process optimization
- Factory acceptance stage: give priority to completing Control strategy function joint inspection
- During on-site inspection: use monitoring system sampling comparison to simplify partial inspection
- System transmission test: it is recommended to be carried out simultaneously with primary equipment maintenance
Risk control measures
Special attention should be paid when conducting fiber channel inspection:
- Channel attenuation detection should be carried out in conjunction with annual communication inspection
- Bit error rate threshold should be strictly controlled below 10-8
- Ultra-long channel transmission time can be relaxed to 30ms

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 37155.1-2018 in English
Technical guidance of protection and control system on regional power grid—Part 1:Functional specification
2018-12-28 -

GB/T 45568-2025 in English
Information specification for relay protection
2025-04-25 -

GB/T 40096.1-2021 in English
Technical specification for on-site protection equipment - Part 1: General specification
2021-05-21 -

GB/T 36283-2018 in English
General technical specifications for secondary cabin of smart substation
2018-06-07 -

GB/T 34121-2017 in English
Technical specification for relay protection configuration tool in smart substation
2017-07-31 -

GB/T 30149-2019 in English
CIM based efficient model exchange format
2019-06-04 -

GB/T 38435-2019 in English
Specification for protection configuration and setting for transmission line of electrified railway traction station
2019-12-31 -

GB/T 32890-2016 in English
Engineering application model of IEC 61850 for relay protection
2016-08-29 -

GB/T 42150.1-2022 in English
Test specification for on-site protection equipment—Part 1:General part
2022-12-30