GB/T 42408-2023 in English
VALIDIndustrial cloud service—Resource configuration requirements
- Issued on:2023-03-17
- Implemented on:2023-10-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$165.00
《GB/T 42408-2023工业云服务 资源配置要求》由TC28(全国信息技术标准化技术委员会)归口,主管部门为国家标准委。
Introduction
1. Standard Overview and Background Analysis
GB/T 42408—2023 "Industrial Cloud Service Resource Configuration Requirements" is the latest standard issued by the State Administration for Market Regulation and the National Standardization Administration, aiming to standardize resource configuration activities in industrial cloud services. The standard was proposed and managed by the National Information Technology Standardization Technical Committee, and the main drafting units include China Electronics Technology Standardization Institute, Intelligent Cloud Technology Co., Ltd. and other industry-leading companies.
2. Comparative Analysis of Standard Frameworks
| Dimensions | GB/T 42408—2023 | Similar standards abroad | Industry status |
|---|---|---|---|
| Technical requirements | Detailed provisions for the process of resource planning, execution, testing and optimization. | Focus on service quality and performance indicators. | Domestic enterprises are gradually aligning with international standards. |
| Resource management | Emphasis on resource orchestration and dynamic adjustment capabilities. | Focus on resource utilization and elastic expansion. | Some enterprises have achieved automated management. |
| Service capabilities | Cover the entire life cycle of R&D design, production and manufacturing. | Focus on specific business scenarios. | The enterprise service chain is gradually improving. |
3. Interpretation of resource allocation process
Planning stage: Resource allocation planning needs to comprehensively consider resource types, quantities and orchestration methods to ensure that they match user needs and platform environment. The planning scheme should include the basic cloud platform topology diagram, network architecture, etc.
4. Implementation Suggestions
4.1 Preliminary Preparation
- Establish a professional resource allocation team.
- Develop a detailed resource allocation plan.
- Choose a suitable industrial cloud service provider.
4.2 Execution Phase
- Use direct configuration or migration configuration.
- Ensure the correct installation of the operating system and components.
- Verify the effectiveness of resource removal and migration mechanisms.
4.3 Testing Phase
- Conduct comprehensive functional and performance testing.
- Ensure that security and compatibility meet requirements.
- Use automated tools to improve testing efficiency.
4.4 Optimization Phase
- Provide online optimization interfaces and tools.
- Adjust resource allocation strategies based on test results.
- Record and analyze optimization effects.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/Z 222-2026 in English
Artificial intelligence—Model as a service (MaaS) performance specification
2026-08-27 -

GB/T 47177.1-2026 in English
Quantum computing service platform—Part 1 : Architecture and functional requirements
2026-02-27 -

GB/T 20299.3-2024 in English
Digital technique application of building and residence community—Part 3:Property management
2024-09-29 -

GB/T 34680.1-2017 in English
Evaluation model and general evaluation indicator system for smart cities - Part 1: General framework and requirements for developing evaluation sub-indicators
2017-10-14 -

GB/T 46480-2025 in English
Evaluation specifications of intelligent manufacturing system solution suppliers
2025-10-31