Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
alkali-free glass frozen aquatic products scopethis standard shared telecommunications infrastructure
GB/T 43565-2023 in English

GB/T 43565-2023 in English

VALID

Basketball court with synthetic surfaces for primary and middle schools

  • Issued on:2023-12-28
  • Implemented on:2024-07-01
  • File Format:PDF
  • Delivery:Within 1 day
Price(USD): $344.00
$334.00

《GB/T 43565-2023中小学合成材料面层篮球场地》由TC125(全国教育装备标准化技术委员会)归口,主管部门为教育部(基础)。


Introduction

Analysis of the core content of the standard

Technical dimension Competition venue Teaching/training venue
Thickness requirement ≥9mm ≥8mm
Impact absorption 20-50% 20-50%
Ball rebound rate ≥75% ≥75%

Key points for the control of hazardous substances

The standard strictly limits the content of short-chain chlorinated paraffin (C10-C13) to ≤0.1g/kg, and the content of MOCA to ≤0.5g/kg. The acceptance case of a middle school in 2023 shows that when using a polyurethane system, special attention should be paid to the free MDI test value, which should be <10g/kg.


Site foundation construction specifications

The compaction degree of the foundation layer must be ≥95%, and the transverse slope must be ≤0.5%. In severe cold areas, a 580-680mm multi-layer structure is recommended: 30mm fine asphalt + 50mm medium-grained stone + 250mm inorganic material + 250mm ash soil.


Implementation suggestions

  1. Material selection:Preferably use prefabricated coils with a total polymer content of ≥30%
  2. Construction supervision:Focus on monitoring the construction window of 5-35℃ ambient temperature
  3. Acceptance process:Must include thickness retest after 14 days of maintenance

Maintenance specifications

Weekly cleaning + quarterly deep cleaning, snow should be removed with soft tools. In case of bulging and damage, it is necessary to repair according to the original process and ensure that the polymer content in the repaired area is ≥15%.

Sample only — not a preview of GB/T 43565-2023
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend