Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
comprehensive safety risk assessment national chemical park safety risk assessment standards safety risk assessment risk assessment systematic safety risk assessment methods standard test method interface treatment rogue base stations
GB/T 45233-2025 in English

GB/T 45233-2025 in English

VALID

Guidelines for comprehensive safety risk assessment of chemical industry park

  • Issued on:2025-01-24
  • Implemented on:2025-05-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $315.00
$306.00
Standard No: GB/T 45233-2025
Document status: VALID
Title in English: Guidelines for comprehensive safety risk assessment of chemical industry park
Title in Chinese: 化工园区安全风险评估导则
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2025-01-24
Implemented on: 2025-05-01
ICS Classification: 71.020-Production in the chemical industry
Chinese Classification: G09-Hygiene, safety and labor protection
Professional Classification: GB-National Standard
Related Keywords: comprehensive safety risk assessment
national chemical park safety risk assessment standards
safety risk assessment
risk assessment
systematic safety risk assessment methods
Related Topics: Security Risk
risk assessment
Analytical Chemicals
risk assessment
Chemical Park
Chemical Industry Park
Chemical Park Enterprise
chemical industry park
Security Risk Assessment Guidelines
Risk Assessment for County Areas
Chemical Park GB
Closed management of chemical industry parks

《GB/T 45233-2025化工园区安全风险评估导则》由TC251(全国危险化学品管理标准化技术委员会)归口,主管部门为国家标准委。


Introduction

1. Background and significance of standard formulation

As the core area for the production and storage of hazardous chemicals, the safety risk assessment of chemical parks is directly related to the safety of people's lives and property and social stability. In recent years, with the rapid development of my country's chemical industry, the number and scale of chemical parks have continued to expand, and safety hazards have also increased.

1.1 Background of standard formulation

  • Policy drive:The Office of the State Council's Safety Committee and other departments have issued documents many times, requiring the strengthening of safety management in chemical parks.
  • Insufficient local practice:Previously, there was a lack of unified standards in various places, and the assessment work was arbitrary and non-standard.
  • Technical requirements:Scientific and systematic safety risk assessment methods and technical guidelines are urgently needed.

1.2 Significance of the Standard

GB/T 45233-2025 fills the gap in the national chemical park safety risk assessment standards and provides unified technical specifications and implementation guidelines for all regions. Through scientific risk assessment, the overall risk level of the park can be effectively reduced and the sustainable development of the chemical industry can be guaranteed.


2. Comparative Analysis of Standard Frameworks

Dimensions Characteristics of the new standard Differences from the old standard Actual impact
Scope of assessment Comprehensive coverage of the entire life cycle, including site selection, enterprise layout, and public facilities The old standard only focused on some links Improve the overall risk management capabilities of the park
Assessment methods Introduce quantitative risk assessment (QRA) and domino effect analysis The old standard mainly focuses on qualitative assessment Improve the scientificity and accuracy of risk assessment
Implementation cycle A comprehensive assessment is required at least every three years The old standard does not have clear cycle regulations Ensure continuous improvement and dynamic management

3. Implementation suggestions and practical applications

3.1 Implementation steps

  1. Data preparation:Collect basic data such as park planning, enterprise information, and accident records.
  2. Risk identification:Identify hazardous sources and harmful factors, including chemical properties, process risks, etc.
  3. Unit division:Divide the assessment units according to the characteristics of the park to ensure that all risk areas are covered.
  4. Method selection:Combining quantitative and qualitative methods, GB/T 37243 and SH/T 3226 are preferred.
  5. Countermeasures and suggestions: Specific prevention and control measures should be proposed for the discovered risk points, and the implementation effect should be evaluated regularly.

3.2 Implementation tools and technologies

To improve the efficiency and accuracy of risk assessment, the following tools and technologies can be used: Quantitative risk assessment software (such as PHAST, JSA), Geographic Information System (GIS), Domino effect simulation model, etc.

3.3 Common problems and solutions in implementation

  • Insufficient data: It is recommended to strengthen the informatization construction of the park and establish a unified data sharing platform.
  • Lack of professional personnel: It is recommended to introduce a third-party technical service agency, or organize internal training to improve capabilities.
  • Long evaluation cycle: A phased evaluation method can be adopted to gradually advance risk management work.

4. Key points of the specification in the charts

Case analysis: Quantitative risk assessment results of a chemical park

Assessment object:A large-scale comprehensive chemical park, involving the production, storage and transportation of hazardous chemicals.

Assessment method:The quantitative risk assessment process specified in GB/T 37243-2019 is adopted, combined with domino effect analysis.

Chart description: Through quantitative calculation, it is determined that the personal risk and social risk of a major hazard source in the park are within an acceptable range. At the same time, it was found that the fire protection distances between some enterprises did not meet the requirements of GB 50160, and there was a risk of secondary accidents.

Sample only — not a preview of GB/T 45233-2025
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.