GB/T 51246-2017 in English
VALIDCode for design of tankcar loading and unloading facilities liquid stocks in petrochemical industry
- Issued on:2017-07-31
- Implemented on:2018-04-01
- File Format:PDF
- Delivery:Via email within 5 business days
$321.00
Introduction
1. Background and significance of standard formulation
According to the requirements of the Ministry of Housing and Urban-Rural Development's "Notice on Issuing the (2014 Engineering Construction Standard Specification Formulation and Revision Plan>" (Jianbiao C2013] No. 169), this specification was edited by Sinopec Guangzhou Engineering Co., Ltd., summarizing the design and management experience of nearly ten years at home and abroad, and drawing on relevant international standards. The specification aims to guide the engineering design of petrochemical liquid material railway loading and unloading facilities to ensure advanced technology, economic rationality, safety and environmental protection.
2. Comparison of standard frameworks
| Chapter | Content Overview | Keywords |
|---|---|---|
| General Principles (Chapter 1) | Scope of application and basic requirements of the specification | Scope of application, basic requirements |
| Terms (Chapter 2) | Define key terms such as loading and unloading pipes, isolation vehicles, etc. | Loading and unloading pipes, isolation vehicles |
| Basic provisions (Chapter 3) | Basic specifications such as annual operating days, range of values for filling coefficients, etc. | Annual operating days, filling coefficients |
3. Analysis of key technical points
3.1 Key points in the design of loading facilities
loading platform needs to consider the annual operation days, daily operation batches and number of vehicles. According to Table 3.0.8, the daily value range of loading and unloading imbalance coefficient for different transport volumes is:
| Transport volume (t/a) | Loading imbalance coefficient |
|---|---|
| Less than 5X104 and ≤50X104 | 1.2-1.3 |
| Greater than 50X104 | 2.5-3.0 |
4. Implementation suggestions and precautions
- Site selection and planning:Terrain conditions should be considered comprehensively, and horizontal layout should be preferred to improve safety.
- Equipment selection:It is recommended to use quantitative loading technology and dynamic track scale for measurement and verification.
- Safety and environmental protection:The closed loading process is suitable for Class A flammable liquids, and oil and gas processing facilities must comply with GB 50759 requirements.
- Operation and maintenance:Regularly check the pipeline sweeping interface to ensure that the anti-condensation measures are effective, especially for high-viscosity materials.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 29188-2022 in English
Brand valuation—Multi-cycle excess earnings method
2022-12-30 -

GB/T 718-2024 in English
Pig iron for casting
2024-05-28 -

GB/T 24135-2022 in English
Rubber- or plastics-coated fabrics—Accelerated-ageing tests
2022-10-12 -

GB/T 4677.15-1988 in English
Test method for solvent and flux resistance of insulating coating on printed boards
- -

GB/T 4340.1-2024 in English
Metallic materials—Vickers hardness test—Part 1: Test method
2024-05-28 -

GB/T 9482-2005 in English
Agricultural machines implements and equipment- Dimensions for mechanical loading with bulk goods
2005-07-11 -

GB/T 17948.3-2017 in English
Rotating electrical machines-Functional evaluation of insulation systems- Test procedures for form-wound windings-Thermal evaluation and classification of insulation systems used in rotating machines
2017-11-01 -

GB 1476-1979 in English
Tellurium
- -

GB/T 36198-2018 in English
Soil quality--Guidance on sampling of soil gas
2018-05-14 -

GB/T 21832.3-2024 in English
Welded austenitic-ferritic(duplex) stainless steel tubes and pipes—Part 3: Pipes for oil and gas transmission
2024-04-25