GB/T 51384-2019 in English
VALIDTechnical standard for foundation treatment on site during heavy equipment lifting in petrochemical industry
- Issued on:2019-07-10
- Implemented on:2019-12-01
- File Format:PDF
- Delivery:Via email within 5 business days
$592.00
本标准适用于石油化工大型设备吊装现场地基处理设计、施工、监测和验收。
Introduction
Interpretation of the Technical Standard for Foundation Treatment of Petrochemical Equipment Hoisting
1. Background and Significance of Standard Formulation
To ensure the safety and economy of hoisting operations of large petrochemical equipment, this standard was formulated under the guidance of the Ministry of Housing and Urban-Rural Development and combined with years of practical experience. It aims to unify the technical requirements for foundation treatment and improve project quality and construction efficiency.
2. Comparative analysis of standard frameworks
| Standard dimensions | General principles | Terms and symbols | Basic provisions |
|---|---|---|---|
| Core content | Clarifies the purpose and scope of foundation treatment for hoisting | Defines key terms and symbol systems | Specifies basic requirements and technical indicators for foundation treatment |
| Scope of application | Applicable to the hoisting of large petrochemical equipment | General terms and symbol systems | Technical details of various foundation treatment methods |
| Innovation points | Proposed a variety of composite foundation treatment solutions | Detailed the protection measures for hidden facilities | Introduced a monitoring and acceptance standard system |
3. Implementation suggestions and precautions
Actual application case analysis
Case background:A large-scale storage tank hoisting project in a petrochemical plant has complex geological conditions and a collapsible loess layer.
Solution:The rigid pile composite foundation method combined with the replacement method is adopted, with a pile spacing of 5 times the pile diameter, a replacement depth of 2.0 meters for the soft soil layer, and a monitoring system is set up to track the foundation stability in real time.
Implementation effect:The foundation bearing capacity is successfully improved to the design requirements, the construction period is shortened by 15%, and the cost is reduced by 10%.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 4937.34-2024 in English
Semiconductor devices—Mechanical and climatic test methods—Part 34:Power cycling
2024-03-15 -

GB/T 34164-2017 in English
Method for evaluation of flotation technological performance in coal preparation plant
2017-09-07 -

GB/T 25906.2-2010 in English
Information technology - Universal multi-octet coded character set - Sibe, Manchu nominal characters, presentation forms and composite characters - 48 Dot matrix fonts - Part 2: Zhenghei Ti
2011-01-10 -

GB 15097-2016 in English
Measure method for emission pollutant of exhaust gas of marine diesel engine
2016-12-23 -

GB/T 11357-2020 in English
Quality, roughness and balance of transmission pulleys
2020-04-28 -

GB/T 3452.5-2022 in English
O-rings for fluid power systems—Part 5:Specification of elastomeric materials
2022-10-12 -

GB/T 14392.3-2023 in English
Layout key for international trade documents—Part 3:Application guidelines
2023-12-28 -

GB 17284-1998 in English
Gasoline engine boosting bicycle
1998-03-25 -

GB 55009-2021 in English
Project code for gas engineering
2021-04-09 -

GB/T 1426-2008 in English
The classifications of carbon materials
-