LD/T 71.8-2019 in English
VALIDThe work quota for the manufacturing industry of rail transit equipmentlocomotive and rolling stock riveting process
- Issued on:2019-01-22
- Implemented on:2019-02-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
Price(USD):
$310.00
$301.00
$301.00
Introduction
This standard provides specific guidelines for labor quota determination in the riveting processing of locomotive and rolling stock within the railway equipment manufacturing industry. It outlines the methods and criteria for calculating labor requirements, taking into account various factors such as work complexity, production efficiency, and operational conditions. The standard is designed to support accurate labor planning and management, ensuring consistency and fairness in labor allocation. It covers detailed procedures for assessing different types of riveting tasks, including the classification of work items, the establishment of time standards, and the application of these standards in practical production scenarios. The content is structured to facilitate implementation by relevant organizations and personnel, contributing to the overall efficiency and standardization of the industry.
*** Please note: This description may not be accurate, please refer to the official documentation.
Sample only — not a preview of LD/T 71.8-2019

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

LD/T 74.4-2008 in English
Construction engineering labor quota installation engineering - ventilation and air conditioning engineering
2009-01-08 -

LD/T 82.4-2006 in English
Configuration Specification for Vocational Skills Training and Identification Equipment of "Household Appliances Maintenance"
2006-07-21