MH/T 6101-2013 in English
VALIDAircraft tank refueller
- Issued on:2013-09-27
- Implemented on:2014-01-01
- File Format:PDF
- Delivery:Via email within 2~4 business days
$465.00
| Standard No: | MH/T 6101-2013 |
| Document status: | VALID |
| Title in English: | Aircraft tank refueller |
| Title in Chinese: | 飞机罐式加油车 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 2~4 business days |
| Issued on: | 2013-09-27 |
| Implemented on: | 2014-01-01 |
| ICS Classification: | 49.100-Ground service and maintenance equipment |
| Chinese Classification: | V57-Special vehicles |
| Professional Classification: | MH-Civil Aviation |
Introduction
Overview of the Standard
MH/T 6101-2013 specifies the technical requirements for the entire life cycle of aircraft tanker trucks at civil airports, including:
- Vehicle environmental adaptability (-30℃~46℃ working range)
- Reliability index (operating MTBF≥60 hours)
- Safety protection system (static resistance≤5Ω)
- Pressure control accuracy (end pressure 0.35±0.035MPa)
Comparison of key technical requirements
| Technical Dimensions | MH/T 6101-2013 | API 1529 | SAE AS5877 |
|---|---|---|---|
| Working Pressure | 0.35MPa±10% | 0.55MPa max | 0.42MPa max |
| Water Hammer Pressure | ≤0.84MPa(instantaneous) | Not specified | ≤1.05MPa |
| Static Conductivity Requirements | Pipeline Resistance≤5Ω | Hose Resistance≤1MΩ | Connector Resistance≤10Ω |
Technical Requirements for Core Components
1. Tank system
The oil tank needs to pass the 36kPa static pressure test, and the capacity design needs to include:
- Rated capacity (pumpable oil volume)
- Remaining oil volume (≥1% of rated oil volume)
- Expansion capacity (≥3% of rated oil volume)
2. Pressure control system
Dual-stage pressure protection mechanism:
- Venturi online control valve: overpressure immediately cut off
- Terminal regulator: maintain 0.35MPa output
Implementation suggestions
Typical application case
In a certain airport refueling truck renovation project, it was found that:
The original vehicle's water hammer pressure reached 1.2MPa. By installing a hydraulic buffer device and optimizing the valve closing curve (10-15 seconds linear closing), the peak pressure was successfully reduced to below 0.8MPa.
Maintenance points
- Monthly inspection of the static conductive mopping zone (JT 230 standard)
- Quarterly calibration of the flow meter (accuracy level 0.2)
- Annual comprehensive inspection of the pressure system

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

MH/T 6100-2013 in English
Aircraft hydrant dispenser
2013-09-27