MZ/T 112-2018 in English
VALIDAdministrative boundary - Boundary settlement
- Issued on:2018-11-05
- Implemented on:2018-11-05
- File Format:PDF
- Delivery:Via email within 1~3 business days
$243.00
| Standard No: | MZ/T 112-2018 |
| Document status: | VALID |
| Title in English: | Administrative boundary - Boundary settlement |
| Title in Chinese: | 行政区域界线 界线勘定 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2018-11-05 |
| Implemented on: | 2018-11-05 |
| ICS Classification: | 01.040.03-Sociology. Services. Company organization and management. Administration. Transport |
| Chinese Classification: | P50-Urban and rural planning |
| Professional Classification: | MZ-Civil Affairs |
| Related Keywords: | mapping boundary
boundary surveying boundary markers joint boundary survey boundary marker point |
| Related Topics: | administrative
ray area Content definition mz Pure world administrative definition administrative district district line Boundary sub-region Boundary definition milk world result definition quadrupole stable region Nuojie Calibration area Chemical industry definition |
本标准规定了行政区域界线勘定工作的术语和定义、准备工作、勘界实施、检查验收、起草行政区域界线协议书、上报的内容和要求。
本标准适用于行政区域界线勘定工作。
Introduction
Analysis of the core content of the standard
| Core elements | Technical requirements | Implementation points |
|---|---|---|
| Principles of boundary survey | Follow legal documents/traditional customary lines/natural rights | A tripartite coordination mechanism needs to be established for disputed areas |
| Setting of boundary markers | In accordance with MZ/T 070-2016 standard | At least one boundary marker point should be set up per kilometer |
| Boundary surveying and mapping | In accordance with GB/T 17796-2009 standard | Meanwhile, the mean error in plane position should be ≤0.2mm. |
Key Technical Requirements
Implementation Specifications for Boundary Surveying and Mapping
Boundary topographic map revisions must meet the following requirements: 1:50,000 scale mapping within a 5km radius on both sides of the boundary. In important areas, total stations should be used for boundary stake coordinate measurement. Elevation measurement accuracy must meet fourth-class leveling requirements.
Analysis of Standard Evolution
Main improvements of this standard compared to the 2006 Boundary Survey Notice: New digital surveying and mapping acceptance specifications have been added, clarifying that boundary stake coordinate measurement must use the 2000 National Geodetic Coordinate System, and adding requirements for electronic archiving of the attached documents to the agreement.
Implementation Recommendations
- Establish a joint boundary survey working group, equipped with professional equipment such as GNSS receivers.
- Disputed areas should adopt a three-step approach of "demarcation on map - field investigation - joint adjudication."
- Boundary marker maintenance should be implemented under a segmented responsibility system, with joint inspections every five years.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

MZ/T 111-2018 in English
Administrative boundary - Detailed map - Integration
2018-11-05