Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
nuclear power plants nuclear power plants seismic instrumentation scopethis standard power plant inspection procedures power plant power plant re-operation tissues scopethis part water pack hemodialysis infection prevention
NB/T 20077-2012 in English

NB/T 20077-2012 in English

VALID

Criteria for the Handling and Initial Evaluation of Records from Nuclear Power Plants Seismic Instrumentation

  • Issued on:2012-01-06
  • Implemented on:2012-04-06
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $180.00
$175.00


Scope

This standard specifies the criteria for timely acquis tion, processing and storage of seis ic instrument recording data in nuclear power plants, including initial assessment criteria to determine whether the ground motion at the site exceeds the power plant operating baseline earthquake (0BE). This standard is applicable to land-based light water reactor nuclear power plants, and other types of nuclear power plants can also be used as a reference. This standard does not apply to the following procedures: a) Power plant inspection procedures that need to be carried out immediately after an earthquake (within 8 hours); b) Procedures for ensuring safe and orderly shutdown; c) Procedures for long-term evaluation of response data of structures and equipment ; Procedures for power plant re-operation.

Sample only — not a preview of NB/T 20077-2012
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend