NB/T 20103-2012 in English
SUPERSEDEDAccident Analysis and Safety Criteria for Pressurized Water Reactor Nuclear Power Plant
- Issued on:2012-01-06
- Implemented on:2012-04-06
- File Format:PDF
- Delivery:Via email within 1~3 business days
$350.00
Scope
This standard specifies the basic contents, assumptions and application criteria for accident analysis of pressurized water reactor nuclear power plants. This standard applies to accident analysis of pressurized water reactor nuclear power plants. This standard does not apply to the analysis of the maximum credible accident (maximum hypothetical accident) used only for safety evaluation in plant site selection.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

NB/T 25045-2015 in English
Performance assessment and management guideline of fire protection features for nuclear power plant
2015-07-01 -

NB/T 31031-2019 in English
Specification for Preparation of Pre-feasibility Study Report for Offshore Wind Power Projects
2019-11-04 -

NB/T 20057.4-2012 in English
PWR Nuclear Power Plants Reactor System Design - Core - Part 4: Core Components
2012-01-06 -

NB/T 20166-2012 in English
Qualification Procedure for Charging Pump of Pressurized Water Reactor Nuclear Power Plant
2012-10-19 -

NB/T 20009.32-2018 in English
Welding material for pressurized water reactor nuclear power plants-Part 32: Low-alloy steel wires and rods for gas shielded arc welding
2018-12-10 -

NB/T 10216-2019 in English
Code for Design,Manufacture and Erection of Steel Tubular Tower of Wind Turbine
2019-06-04 -

NB/T 32001-2012 in English
Technical Specification for Environmental Impact Assessment of Photovoltaic Power Station
2012-08-23 -

NB/T 14018-2016 in English
Technical requirement for design of shale gas horizontal well
2016-12-05 -

NB/T 20524-2018 in English
Design criteria for safe shutdown of pressurized water reactor nuclear power plants
2018-12-10 -

NB/T 32042-2018 in English
Code of engineering supervision for photovoltaic power project
2018-04-03