Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
pwr nuclear power plant scopethis standard nuclear power plant construction projects nuclear power plants technical requirements embedment parts manufacture antioxidant n-1,3-dimethylbutyl-n′-phenyl-p-phenylenediamine spring bamboo shoots barometers
NB/T 20127-2012 in English

NB/T 20127-2012 in English

SUPERSEDED

Technical Requirements for Embedment Parts Manufacture and Installation of PWR Nuclear Power Plant

  • Issued on:2012-01-06
  • Implemented on:2012-04-06
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $240.00
$233.00
Standard No: NB/T 20127-2012
Document status: SUPERSEDED
Superseded by: NB/T 20127-2019 Technical requirements for embedment parts manufacture and installation in PWR nuclear power plant
Superseded on: 2020-07-01
Title in English: Technical Requirements for Embedment Parts Manufacture and Installation of PWR Nuclear Power Plant
Title in Chinese: 压水堆核电厂预埋件制作与安装技术要求
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2012-01-06
Implemented on: 2012-04-06
Professional Classification: NB-Energy
Related Keywords: pwr nuclear power plant scopethis standard
nuclear power plant construction projects
nuclear power plants
technical requirements
embedment parts manufacture
Related Topics: PWR
nb/t 20186-2012
NB/T+20186-2012
nb/t20039.3-2012
nb/t20119-2012
PWR nuclear power plant loose parts and
nb/t 20192-2012
Technical specification for installation of rod power system in pressurized water reactor nuclear power plant
nb/t 20039.3-2012
nb/t20039.8-2012
nb/t20133.6-2012
nb/t 20182-2012
nb/t 20127-2012
nb/t 20136-2012
nb/t 20193-2012
Pressurized water reactor nuclear power plant
production and installation
NB20127
NB/t 20127
to bury
NB/T31022-2012
Installation method of embedded parts in Dongguan
Embedded parts
nb/t20193-2012
nb/t47025-2012
nb/t47021-2012
nb/t 20139-2012
Pressurized Water Reactor Standard
nb/t 20123-2012
nb/t 20185-2012
nb/t 20194-2012
nb/t47023-2012
nb/t 47022-2012
nb/t47024-2012
nb/t20125-2012
nb/t 20127-2019
nb/t 47027-2012
nb/t10558-2012
nb/t47022-2012
nb/t 20247-2012
nb/t20096-2012
nb/t 47021-2012


Scope

This standard specifies the technical requirements and quality management for prefabrication and installation of pressurized water reactor nuclear power plant construction projects. This standard is applicable to the production and installation of important embedded parts for nuclear is ands, conventional is ands and BOP plant construction projects of pressurized water reactor nuclear power plants. The embedded parts referred to in this standard include anchors, steel casings, steel frames, and concrete soil inserts. rail. This standard does not apply to the fabrication and installation of containment steel lining anchors and sleeves, stainless steel lining anchors and sleeves, steel bars and mechanical joints, and prestressed systems.

Sample only — not a preview of NB/T 20127-2012
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend