NB/T 20481-2018 in English
VALIDRules for design and fabrication of the primary coolant piping in pressurized water reactor nuclear power plants
- Issued on:2018-03-22
- Implemented on:2018-09-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$204.00
Introduction
*** Please note: This description may not be accurate, please refer to the official documentation.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

NB/T 11235-2023 in English
Clean warm air biofuel fireplace
2023-05-26 -

NB/T 10229-2019 in English
Specification for Acceptance of Environmental Protection Facilities for Hydropower Projects
2019-11-04 -

NB/T 10036-2017 in English
Safety management specification of coalbed methane production station
2017-11-15 -

NB/T 11325-2023 in English
Technical requirements of intelligent gas safety drainage system in coal mine
2023-10-11 -

NB/T 20037.9-2018 in English
Level 1 Probabilistic safety assessment for nuclear power plant applications—Part 9:Other external hazards at-power PSA
2018-03-22 -

NB/T 20476.10-2019 in English
Operating license extension of nuclear power plants—Part 10: Time-limited ageing analysis for pre-stressed concrete containment
2019-12-30 -

NB/T 20254-2013 in English
Code for the Leakage Detection of Reactor Coolant System in Nuclear Power Plants
2013-06-08 -

NB/T 35094-2017 in English
Coe for water temperature calculation of hydropower projeets
2017-03-28 -

NB/SH/T 0860-2013 in English
Test Method Filter and Cultivation Procedure for the Counting of Living Microbe and Fungus in Liquid Fuel
2013-06-08 -

NB/T 31069-2015 in English
Communications for monitoring and control of wind power plants—Mapping to communication profile
2015-04-02