Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
mpi communication performance test strengthen function test test typetoolkey indicators i/o performance iozone read evaluation key test indicator system computational performance test use grapes high performance computer systemtest hard magnetic materials scopethis international standard insulated wire byproduct calcium chloride
QX/T 148-2020 in English

QX/T 148-2020 in English

VALID

Specification for high performance computer systemtest and evaluation in the meteorological field

  • Issued on:2020-07-31
  • Implemented on:2020-12-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $510.00
$495.00
Standard No: QX/T 148-2020
Document status: VALID
Title in English: Specification for high performance computer systemtest and evaluation in the meteorological field
Title in Chinese: 气象领域高性能计算机系统测试与评估规范
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2020-07-31
Implemented on: 2020-12-01
Superseding: QX/T 148-2011 Specification for high performance computer system test and evaluation in the meteorological field
Professional Classification: QX-Meteorology
Related Keywords: mpi communication performance test strengthen
function test test typetoolkey indicators i/o performance iozone read
evaluation key test indicator system
computational performance test use grapes
high performance computer systemtest
Related Topics: high performance
test vendor
test vendor
Meteorology + Thirteenth Five-Year + Evaluation
Normative Assessment Area
Profitability in testing
test evaluation
climate field
high performance computer
climate field
field statistics
Technology in computer related fields
Energy storage field
Computer related technologies
qx/t-2020
qx/t 567-2020


Introduction

Core changes in the standard revision

Contents of the 2011 versionUpdates to the 2020 versionTechnical impact
Applicable only to procurement scenarios Extended to leasing scenarios Adapt to cloud computing service models
Core test terms Changed to benchmark test terms Aligned with international standards
No MPI communication test Added MPI communication performance test Strengthen parallel computing evaluation

Key test indicator system

1. Computational performance test

Use GRAPES, WRF and other meteorological numerical models:

  • Speedup ratio test: requires at least 8 parallel scale steps
  • Peak performance = single-core performance × number of CPU cores
  • Typical test case: 0.25° resolution GRAPES global model 8-day forecast

2. System function test

Test typeToolKey indicators
I/O performance IOzone Read and Write Bandwidth/Latency
MPI Communication Intel MPI Benchmarks Cross-node Communication Efficiency
Memory Bandwidth STREAM Copy/Scale/Add Triad

Analysis of Implementation Key Points

Test Environment Requirements

  • Operating System: UNIX/Linux 64-bit and above
  • Test Node: Fully Configured Computing Units, Memory Can Be Flexible
  • Data Media: Mobile Hard Drives/CDs Must Be Verified for Availability

Avoidance of Typical Problems

  1. Optimization test must retain the OPTMOD modification mark
  2. The calculation result must provide a complete mathematical derivation process
  3. Job scheduling test needs to verify preemptive resource allocation

Innovation in evaluation method

Adopt a double scoring mechanism:

 S = Ss(overall situation) + St(test question) St = ∑[Sbi + (Smi-Sbi)×Ri] 

The calculation formula of the scoring factor Ri is:

 Ri = Tmin/T (Tmin is the shortest running time) 

Example: When the test time of manufacturer A is 913.35 seconds (benchmark 896.98 seconds):

Score = 1+(9-1)×(896.98/913.35)=8.857 points

Sample only — not a preview of QX/T 148-2020
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend