Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
lightning protection zone lightning protection category key technical parameters protection entire water supply system current requirements voltage protection level installation particular cellulose source map printing cyberspace security simulation operation control
QX/T 399-2017 in English

QX/T 399-2017 in English

VALID

Technical specification for lightning protection of water supply system

  • Issued on:2017-10-30
  • Implemented on:2018-03-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $550.00
$534.00
Standard No: QX/T 399-2017
Document status: VALID
Title in English: Technical specification for lightning protection of water supply system
Title in Chinese: 供水系统防雷技术规范
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2017-10-30
Implemented on: 2018-03-01
Professional Classification: QX-Meteorology
Related Keywords: lightning protection zone
lightning protection category
key technical parameters protection
entire water supply system
current requirements voltage protection level installation
Related Topics: thunder
lightning protection
Power distribution system lightning protection
Lightning Protection Technology of Communication Engineering Power System
hj /t 399


Introduction

Analysis of the core content of the standard

This standard systematically stipulates the technical requirements for lightning protection throughout the entire water supply system, from the water treatment plant to the pumping station, and innovatively associates and grades the lightning protection zone with the size of the city and the size of the water plant. Key points include:

  • Lightning protection classification standards for three types of buildings (based on lightning strike frequency and city size)
  • Mandatory requirements for underground laying of medium and high voltage systems
  • Construction of M-type equipotential bonding network for electronic systems
  • Special protection plans for special places (chlorination room/liquid oxygen station)

Comparison of key technical parameters

Protection objects SPD level Insurge current requirements Voltage protection level Installation spacing
Main distribution box (Level I) Level I test ≥12.5kA ≤2.5kV
PLC cabinet (Level Ⅱ) Level Ⅱ test ≥5kA ≤1.2kV ≤5m
Instrument signal line (Level Ⅲ) Level Ⅲ test ≥3kA ≤1kV ≤10m

Key points for protection in special places

Chlorination/ammonia dosing system

Copper equipotential bonding bars are required, key equipment requires double-point grounding, and the flange jumper resistance is less than 0.03Ω. For SPD installation examples, see Figures B.7-B.8 in Appendix B of the standard.

Liquid oxygen station

When the wall thickness of the storage tank is ≥4mm, the lightning rod can be omitted, but the following must be met:

  • The distance between grounding points is ≤30m
  • The impulse grounding resistance is ≤30Ω
  • The oxygen pipe flange jumper resistance is <0.03Ω

Implementation suggestions

Design stage

  1. Determine the lightning protection category of the building according to Appendix A
  2. Electronic systems shall preferably adopt Mm type equipotential bonding network
  3. Long-distance signal lines shall adopt double shielding or wear steel pipes

Construction stage

  • The cross-sectional area of the SPD connecting line is ≥1.2mm²
  • Equipotential bonding transition resistance ≤ 0.2Ω
  • Grounding of both ends of the metal sheath of the armored cable

Inspection and maintenance

Inspection before the thunderstorm season each year, focusing on the following:

  • Grounding resistance value (according to the minimum required value)
  • SPD degradation indication status
  • Shield line conductivity

Sample only — not a preview of QX/T 399-2017
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend